{"id":66219,"date":"2026-10-22T08:03:51","date_gmt":"2026-10-22T07:03:51","guid":{"rendered":"https:\/\/www.bizneo.com\/blog\/?p=66219"},"modified":"2026-10-22T08:03:52","modified_gmt":"2026-10-22T07:03:52","slug":"planification-de-projet","status":"publish","type":"post","link":"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/","title":{"rendered":"Planification de projet : comment construire un planning fiable en 7 \u00e9tapes"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Une <strong>planification de projet<\/strong> organise les t\u00e2ches, les responsables et les d\u00e9lais d&#8217;un projet avant son ex\u00e9cution. Elle s&#8217;appuie sur la capacit\u00e9 r\u00e9elle de l&#8217;\u00e9quipe, pas seulement sur une liste de dates souhait\u00e9es.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La cause la plus fr\u00e9quente de retard n&#8217;est pas une mauvaise estimation du travail \u00e0 faire : <strong>c&#8217;est une mauvaise estimation du temps r\u00e9ellement disponible pour le faire<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un planning fiable relie donc <strong>les t\u00e2ches, les d\u00e9pendances et la disponibilit\u00e9 r\u00e9elle<\/strong> de l&#8217;\u00e9quipe, pas seulement une suite de dates.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu&#8217;est-ce que la planification de projet ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La planification de projet est le processus qui consiste \u00e0 <strong>d\u00e9finir le p\u00e9rim\u00e8tre, d\u00e9couper le travail en t\u00e2ches et fixer les d\u00e9lais et les ressources<\/strong> n\u00e9cessaires pour atteindre un objectif donn\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Elle connecte les t\u00e2ches, les dur\u00e9es, les responsables, les d\u00e9pendances et les jalons dans un plan qui peut \u00eatre suivi et ajust\u00e9. L&#8217;\u00e9quipe sait quelle est la prochaine \u00e9tape, la direction rep\u00e8re les conflits de charge et les services concern\u00e9s savent quand intervenir.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Elle se distingue de la <a href=\"https:\/\/www.bizneo.com\/blog\/fr\/gestion-des-taches-rh\/\" data-wpel-link=\"internal\" target=\"_blank\">gestion des t\u00e2ches<\/a> au quotidien, centr\u00e9e sur l&#8217;ex\u00e9cution courante plut\u00f4t que sur le calendrier d&#8217;un projet ponctuel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un bon planning aide \u00e0 <strong>anticiper les blocages, arbitrer les priorit\u00e9s et mesurer l&#8217;impact d&#8217;un changement<\/strong>. Il ne supprime pas les impr\u00e9vus : il donne une r\u00e9f\u00e9rence pour trancher rapidement quand ils surviennent.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Que doit contenir un planning de projet ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Avant de choisir un outil, d\u00e9finissez les informations \u00e0 suivre. Un planning simple fonctionne d\u00e9j\u00e0 avec ces champs :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Activit\u00e9 et r\u00e9sultat attendu :<\/strong> d\u00e9crivent le travail et ce qui doit \u00eatre livr\u00e9.<\/li>\n\n\n\n<li><strong>Responsable :<\/strong> la personne qui r\u00e9pond de l&#8217;ex\u00e9cution.<\/li>\n\n\n\n<li><strong>Effort estim\u00e9 :<\/strong> le nombre d&#8217;heures de travail n\u00e9cessaires.<\/li>\n\n\n\n<li><strong>Dur\u00e9e :<\/strong> le temps que l&#8217;activit\u00e9 occupe dans le calendrier.<\/li>\n\n\n\n<li><strong>D\u00e9pendances :<\/strong> les livrables qui doivent \u00eatre pr\u00eats avant qu&#8217;une autre t\u00e2che ne commence.<\/li>\n\n\n\n<li><strong>Statut et blocages :<\/strong> permettent de suivre l&#8217;avancement et ce qui freine la progression.<\/li>\n\n\n\n<li><strong>Jalons :<\/strong> mettent en \u00e9vidence les d\u00e9cisions ou validations importantes.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.bizneo.com\/fr\/gestion-de-projets-et-taches\/\" data-wpel-link=\"internal\" target=\"_blank\"><img decoding=\"async\" width=\"1024\" height=\"702\" src=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/permissions-projets-1024x702.webp\" alt=\"Configuration des projets et droits d'acc\u00e8s\" class=\"wp-image-66236\" srcset=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/permissions-projets-1024x702.webp 1024w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/permissions-projets-300x206.webp 300w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/permissions-projets-768x527.webp 768w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/permissions-projets.webp 1500w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Effort et dur\u00e9e, est-ce la m\u00eame chose ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Non. <strong>L&#8217;effort est la quantit\u00e9 de travail, la dur\u00e9e est le temps n\u00e9cessaire pour le r\u00e9aliser.<\/strong> Une t\u00e2che de huit heures peut durer deux jours ouvr\u00e9s si le responsable ne dispose que de quatre heures par jour pour le projet.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le d\u00e9lai peut aussi inclure une attente de validation ou de r\u00e9ponse d&#8217;un autre service. Ce temps allonge la dur\u00e9e sans augmenter l&#8217;effort d&#8217;ex\u00e9cution.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment faire une planification de projet en 7 \u00e9tapes<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">1. D\u00e9finir le p\u00e9rim\u00e8tre et le r\u00e9sultat attendu<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Partez du livrable final et du crit\u00e8re de fin<\/strong>. \u00ab Am\u00e9liorer l&#8217;accueil des nouveaux salari\u00e9s \u00bb reste flou. \u00ab D\u00e9ployer un parcours d&#8217;int\u00e9gration avec un livret, des responsables et une validation d\u00e9finis \u00bb d\u00e9limite mieux le travail.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Indiquez aussi ce qui reste hors p\u00e9rim\u00e8tre. Si le projet n&#8217;inclut pas l&#8217;int\u00e9gration avec un autre outil, cette exclusion doit \u00eatre claire avant d&#8217;estimer les d\u00e9lais.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. D\u00e9couper le travail en t\u00e2ches suivables<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">D\u00e9composez le projet en \u00e9tapes avec des r\u00e9sultats observables. Plut\u00f4t que \u00ab pr\u00e9parer le d\u00e9ploiement \u00bb, utilisez des actions comme cartographier le parcours actuel, concevoir le nouveau parcours ou cr\u00e9er les contenus.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00c9vitez les deux extr\u00eames : <strong>une t\u00e2che trop large pour \u00eatre suivie, et une liste de micro-actions ing\u00e9rable<\/strong>. Le bon niveau de d\u00e9tail permet d&#8217;estimer le travail, d&#8217;attribuer une responsabilit\u00e9 claire et de v\u00e9rifier la fin de la t\u00e2che.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.bizneo.com\/fr\/gestion-de-projets-et-taches\/\" data-wpel-link=\"internal\" target=\"_blank\"><img decoding=\"async\" width=\"1024\" height=\"750\" src=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban-projets-1024x750.webp\" alt=\"Tableau kanban \" class=\"wp-image-66198\" srcset=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban-projets-1024x750.webp 1024w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban-projets-300x220.webp 300w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban-projets-768x562.webp 768w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban-projets.webp 1500w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">3. Identifier les d\u00e9pendances et les t\u00e2ches parall\u00e8les<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Demandez-vous <strong>ce qui doit se terminer avant que chaque t\u00e2che ne commence<\/strong>. Un pilote d\u00e9pend d&#8217;un parcours valid\u00e9 ; la cr\u00e9ation des acc\u00e8s d\u00e9pend des besoins d\u00e9finis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Le parall\u00e9lisme ne r\u00e9duit le d\u00e9lai que s&#8217;il existe une capacit\u00e9 r\u00e9elle disponible.<\/strong> Mettre deux t\u00e2ches en simultan\u00e9 pour la m\u00eame personne ne cr\u00e9e pas d&#8217;heures suppl\u00e9mentaires.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Estimer l&#8217;effort, la dur\u00e9e et les incertitudes<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Demandez les estimations aux personnes qui connaissent l&#8217;activit\u00e9 et consultez des projets similaires. <strong>Documentez les hypoth\u00e8ses<\/strong> : une estimation de douze heures peut supposer un acc\u00e8s d\u00e9j\u00e0 ouvert.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En cas d&#8217;incertitude r\u00e9elle, notez une marge justifi\u00e9e plut\u00f4t que de r\u00e9partir une r\u00e9serve arbitraire sur toutes les t\u00e2ches.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. V\u00e9rifier la capacit\u00e9 r\u00e9elle de l&#8217;\u00e9quipe<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Comparez l&#8217;effort pr\u00e9vu au <strong>temps que chaque personne peut r\u00e9ellement consacrer au projet<\/strong>. La dur\u00e9e contractuelle ne dit rien de sa disponibilit\u00e9 r\u00e9elle pour de nouvelles t\u00e2ches.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Une personne \u00e0 35 heures par semaine avec quatre heures d&#8217;absence et vingt-huit heures d\u00e9j\u00e0 engag\u00e9es sur d&#8217;autres sujets ne dispose que de <strong>trois heures nettes disponibles<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le logiciel de gestion de projets et t\u00e2ches de Bizneo HR croise les heures de la convention collective avec les t\u00e2ches assign\u00e9es et d\u00e9duit les absences, pour confronter le travail pr\u00e9vu \u00e0 la disponibilit\u00e9 r\u00e9elle avant de confirmer les dates.<\/p>\n\n\n\n<bzn-link><a href=\"\/fr\/gestion-de-projets-et-taches\/\" id=\"destacado-planification-projet\" target=\"_blank\" rel=\"noopener\" data-wpel-link=\"internal\"><span class=\"bzn-link-title\"><strong>Pilotez vos projets sans quitter la gestion du temps<\/strong><\/span>D\u00e9couvrez notre logiciel de gestion de projets et t\u00e2ches, avec calcul de la capacit\u00e9 r\u00e9elle de votre \u00e9quipe<\/a><\/bzn-link>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.bizneo.com\/fr\/gestion-de-projets-et-taches\/\" data-wpel-link=\"internal\" target=\"_blank\"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/calcul-capacite-equipe-1024x683.webp\" alt=\"Calcul automatique de la capacit\u00e9 de l'\u00e9quipe\" class=\"wp-image-66206\" srcset=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/calcul-capacite-equipe-1024x683.webp 1024w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/calcul-capacite-equipe-300x200.webp 300w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/calcul-capacite-equipe-768x512.webp 768w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/calcul-capacite-equipe.webp 1500w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6. R\u00e9partir les dates et fixer les jalons<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Une fois la s\u00e9quence et la capacit\u00e9 v\u00e9rifi\u00e9es, d\u00e9finissez le d\u00e9but et la fin de chaque t\u00e2che. Tenez compte des jours ouvr\u00e9s, des jours f\u00e9ri\u00e9s et des cong\u00e9s des personnes concern\u00e9es.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un jalon comme \u00ab parcours valid\u00e9 \u00bb repr\u00e9sente un \u00e9v\u00e9nement, <strong>g\u00e9n\u00e9ralement sans dur\u00e9e<\/strong>. La r\u00e9union n\u00e9cessaire pour y arriver se planifie comme une activit\u00e9 \u00e0 part.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">7. Valider le plan et organiser le suivi<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Passez en revue le planning avec les responsables et les services concern\u00e9s. Confirmez que les livrables sont compris et que les ressources seront disponibles aux dates pr\u00e9vues.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Apr\u00e8s validation, enregistrez la version approuv\u00e9e comme <strong>ligne de base<\/strong>. Elle sert de r\u00e9f\u00e9rence pour comparer le pr\u00e9vu au r\u00e9alis\u00e9. D\u00e9finissez aussi quels blocages doivent \u00eatre signal\u00e9s d\u00e8s qu&#8217;ils apparaissent.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Exemple de planning : d\u00e9ployer un nouveau parcours d&#8217;int\u00e9gration<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Prenons un projet type : concevoir et lancer un nouveau parcours d&#8217;int\u00e9gration sur trois sites, avec un objectif de <strong>mise en service apr\u00e8s un pilote valid\u00e9, en douze jours ouvr\u00e9s<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th><strong>ID<\/strong><\/th><th><strong>Activit\u00e9 et responsable<\/strong><\/th><th><strong>Effort<\/strong><\/th><th><strong>P\u00e9riode \/ dur\u00e9e<\/strong><\/th><th><strong>D\u00e9pend de<\/strong><\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>Cartographier le parcours actuel (Claire)<\/td><td>8 h<\/td><td>J1-J2 \/ 2 jours<\/td><td>Aucune<\/td><\/tr><tr><td>2<\/td><td>Concevoir le nouveau parcours (Claire)<\/td><td>8 h<\/td><td>J3-J4 \/ 2 jours<\/td><td>1<\/td><\/tr><tr><td>3<\/td><td>Valider le parcours avec les managers (Marc)<\/td><td>2 h<\/td><td>J5 \/ 1 jour<\/td><td>2<\/td><\/tr><tr><td>4<\/td><td>Cr\u00e9er les contenus d&#8217;accueil (Thomas)<\/td><td>12 h<\/td><td>J6-J8 \/ 3 jours<\/td><td>3<\/td><\/tr><tr><td>5<\/td><td>Pr\u00e9parer les acc\u00e8s informatiques (Nadia)<\/td><td>8 h<\/td><td>J6-J7 \/ 2 jours<\/td><td>3<\/td><\/tr><tr><td>6<\/td><td>Lancer et \u00e9valuer le pilote (Claire)<\/td><td>8 h<\/td><td>J9-J10 \/ 2 jours<\/td><td>4 et 5<\/td><\/tr><tr><td>7<\/td><td>Ajuster et valider le d\u00e9ploiement (Thomas)<\/td><td>4 h<\/td><td>J11 \/ 1 jour<\/td><td>6<\/td><\/tr><tr><td>8<\/td><td>D\u00e9ployer sur les autres sites (Claire)<\/td><td>4 h<\/td><td>J12 \/ 1 jour<\/td><td>7<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">L&#8217;effort total est de <strong>54 heures<\/strong>, r\u00e9parti entre Claire, Thomas, Marc et Nadia. La dur\u00e9e du projet est de <strong>douze jours ouvr\u00e9s<\/strong>, pas la somme des dur\u00e9es : les activit\u00e9s 4 et 5 se d\u00e9roulent en parall\u00e8le, avec des responsables diff\u00e9rents.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La validation du parcours est un jalon \u00e0 la fin du J5. Le feu vert pour d\u00e9ployer en est un autre, \u00e0 la fin du J11. <strong>Si la validation n&#8217;est pas obtenue, les \u00e9tapes d\u00e9pendantes ne doivent pas d\u00e9marrer automatiquement.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pour adapter ce mod\u00e8le, remplacez les activit\u00e9s, les responsables et l&#8217;effort, puis recalculez les p\u00e9riodes selon les d\u00e9pendances et la capacit\u00e9 r\u00e9elle de votre \u00e9quipe plut\u00f4t que de copier les dates telles quelles.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Liste, calendrier ou diagramme de Gantt : quel format choisir ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Le meilleur format est celui qui <strong>facilite les d\u00e9cisions et reste \u00e0 jour<\/strong>. La m\u00eame base d&#8217;informations peut alimenter diff\u00e9rentes visualisations.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th><strong>Format<\/strong><\/th><th><strong>Quand \u00e7a peut fonctionner<\/strong><\/th><th><strong>Point de vigilance<\/strong><\/th><\/tr><\/thead><tbody><tr><td><strong>Tableur<\/strong><\/td><td>Planning simple, peu de t\u00e2ches<\/td><td>N\u00e9cessite des champs coh\u00e9rents et un contr\u00f4le pour \u00e9viter les versions divergentes<\/td><\/tr><tr><td><strong>Calendrier<\/strong><\/td><td>Mettre en avant des \u00e9ch\u00e9ances et r\u00e9unions pr\u00e9cises<\/td><td>Peut rendre les d\u00e9pendances difficiles \u00e0 lire<\/td><\/tr><tr><td><strong>Diagramme de Gantt<\/strong><\/td><td>Projets avec plusieurs d\u00e9pendances et responsables<\/td><td>Sa valeur d\u00e9pend de donn\u00e9es de planification fiables<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Quand le planning doit aussi refl\u00e9ter la charge r\u00e9elle de l&#8217;\u00e9quipe<\/strong>, le logiciel de <a href=\"https:\/\/www.bizneo.com\/fr\/gestion-de-projets-et-taches\/\" data-wpel-link=\"internal\" target=\"_blank\">gestion de projets et t\u00e2ches<\/a> de Bizneo HR r\u00e9unit la planification des t\u00e2ches et la capacit\u00e9 hebdomadaire au m\u00eame endroit.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment mettre \u00e0 jour le planning en cas de retard ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Identifiez d&#8217;abord la cause et estimez le travail restant. \u00ab La t\u00e2che a pris du retard \u00bb ne suffit pas : <strong>un manque de validation, un manque de capacit\u00e9 ou une nouvelle exigence<\/strong> n&#8217;appellent pas la m\u00eame r\u00e9ponse.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">V\u00e9rifiez ensuite les activit\u00e9s concern\u00e9es et les possibilit\u00e9s de rattrapage. Avancer une t\u00e2che ind\u00e9pendante peut aider ; d\u00e9marrer un travail sans validation peut seulement g\u00e9n\u00e9rer du retravail.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pr\u00e9servez la ligne de base.<\/strong> Modifier toutes les anciennes dates pour qu&#8217;elles co\u00efncident avec les nouvelles emp\u00eache de mesurer l&#8217;\u00e9cart. Si un changement formel justifie une nouvelle ligne de base, conservez la version pr\u00e9c\u00e9dente dans l&#8217;historique.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Erreurs qui compromettent un planning de projet<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Planifier sur 100 % du temps de travail :<\/strong> ignore les t\u00e2ches courantes et les absences d\u00e9j\u00e0 pr\u00e9vues.<\/li>\n\n\n\n<li><strong>Oublier les validations :<\/strong> transforme des attentes pr\u00e9visibles en retards apparemment inattendus.<\/li>\n\n\n\n<li><strong>Fixer un d\u00e9lai sans consulter les ex\u00e9cutants :<\/strong> augmente le risque d&#8217;estimations irr\u00e9alistes.<\/li>\n\n\n\n<li><strong>Mesurer l&#8217;avancement au nombre de t\u00e2ches :<\/strong> dix petites actions termin\u00e9es ne compensent pas un livrable critique bloqu\u00e9.<\/li>\n\n\n\n<li><strong>Mettre \u00e0 jour les dates sans communiquer l&#8217;impact :<\/strong> laisse d&#8217;autres services travailler sur des informations d\u00e9pass\u00e9es.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Planifier vos projets avec Bizneo HR<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Bizneo HR calcule la capacit\u00e9 r\u00e9elle de chaque collaborateur<\/strong> \u00e0 partir des heures de la convention collective, en d\u00e9duisant automatiquement les absences et les cong\u00e9s, plut\u00f4t qu&#8217;une estimation approximative.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Chaque t\u00e2che a son responsable, une \u00e9ch\u00e9ance et un temps estim\u00e9, et le <strong><a href=\"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/\" data-wpel-link=\"internal\" target=\"_blank\">tableau Kanban<\/a><\/strong> et l&#8217;arborescence de projets donnent au chef de projet une vision du pipeline sans relancer personne.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.bizneo.com\/fr\/gestion-de-projets-et-taches\/\" data-wpel-link=\"internal\" target=\"_blank\"><img decoding=\"async\" width=\"1024\" height=\"702\" src=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/arborescence-projets-1024x702.webp\" alt=\"Arborescence des projets\" class=\"wp-image-66202\" srcset=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/arborescence-projets-1024x702.webp 1024w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/arborescence-projets-300x206.webp 300w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/arborescence-projets-768x527.webp 768w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/arborescence-projets.webp 1500w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Le logiciel offre aussi un <strong>rapport de productivit\u00e9<\/strong> qui compare les estimations aux t\u00e2ches r\u00e9ellement engag\u00e9es, pour ajuster les prochains plannings sur des donn\u00e9es plut\u00f4t que sur des hypoth\u00e8ses.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"\/fr\/tableau-de-bord-rh\/\" data-wpel-link=\"internal\" target=\"_blank\"><img decoding=\"async\" width=\"1360\" height=\"408\" src=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH.jpg\" alt=\"Logiciel rapports RH\" class=\"wp-image-45498\" srcset=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH.jpg 1360w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH-300x90.jpg 300w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH-1024x307.jpg 1024w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH-768x230.jpg 768w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH-810x243.jpg 810w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH-1140x342.jpg 1140w\" sizes=\"(max-width: 1360px) 100vw, 1360px\" \/><\/a><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-3182e22e\"><h2 class=\"uagb-heading-text\">Questions fr\u00e9quentes sur la planification de projet<\/h2><\/div>\n\n\n<div class=\"wp-block-uagb-faq uagb-faq__outer-wrap uagb-block-d75656b6 uagb-faq-icon-row uagb-faq-layout-accordion uagb-faq-expand-first-true uagb-faq-inactive-other-true uagb-faq__wrap uagb-buttons-layout-wrap uagb-faq-equal-height     \" data-faqtoggle=\"true\" role=\"tablist\"><script type=\"application\/ld+json\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"FAQPage\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Qui doit \\u00eatre responsable de la mise \\u00e0 jour du planning ?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Le chef de projet garde une vision consolid\\u00e9e, mais chaque responsable doit signaler l'avancement, le travail restant et les blocages de ses t\\u00e2ches. Les validateurs doivent aussi communiquer tout changement de disponibilit\\u00e9.\"}},{\"@type\":\"Question\",\"name\":\"Un planning fonctionne-t-il pour des activit\\u00e9s r\\u00e9currentes ?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Oui, \\u00e0 condition que la p\\u00e9riode et les livrables soient d\\u00e9finis. Les t\\u00e2ches r\\u00e9currentes demandent en revanche une r\\u00e9vision r\\u00e9guli\\u00e8re de la capacit\\u00e9 et des priorit\\u00e9s, plus fr\\u00e9quente que pour un projet ponctuel.\"}},{\"@type\":\"Question\",\"name\":\"Comment savoir si le planning fonctionne ?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"V\\u00e9rifiez que l'\\u00e9quipe identifie facilement la prochaine \\u00e9ch\\u00e9ance, son responsable et les blocages en cours. Comparez les dates et l'effort pr\\u00e9vus aux dates r\\u00e9elles, et utilisez les \\u00e9carts pour affiner les prochaines estimations.\"}}]}<\/script><div class=\"wp-block-uagb-faq-child uagb-faq-child__outer-wrap uagb-faq-item uagb-block-f49531e8 \" role=\"tab\" tabindex=\"0\"><div class=\"uagb-faq-questions-button uagb-faq-questions\">\t\t\t<span class=\"uagb-icon uagb-faq-icon-wrap\">\n\t\t\t\t\t\t\t\t<svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox= \"0 0 448 512\"><path d=\"M432 256c0 17.69-14.33 32.01-32 32.01H256v144c0 17.69-14.33 31.99-32 31.99s-32-14.3-32-31.99v-144H48c-17.67 0-32-14.32-32-32.01s14.33-31.99 32-31.99H192v-144c0-17.69 14.33-32.01 32-32.01s32 14.32 32 32.01v144h144C417.7 224 432 238.3 432 256z\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t<span class=\"uagb-icon-active uagb-faq-icon-wrap\">\n\t\t\t\t\t\t\t\t<svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox= \"0 0 448 512\"><path d=\"M400 288h-352c-17.69 0-32-14.32-32-32.01s14.31-31.99 32-31.99h352c17.69 0 32 14.3 32 31.99S417.7 288 400 288z\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/span>\n\t\t\t<h3 class=\"uagb-question\">Qui doit \u00eatre responsable de la mise \u00e0 jour du planning ?<\/h3><\/div><div class=\"uagb-faq-content\"><p>Le chef de projet garde une vision consolid\u00e9e, mais chaque responsable doit signaler l&#8217;avancement, le travail restant et les blocages de ses t\u00e2ches. Les validateurs doivent aussi communiquer tout changement de disponibilit\u00e9.<\/p><\/div><\/div><div class=\"wp-block-uagb-faq-child uagb-faq-child__outer-wrap uagb-faq-item uagb-block-cc6caf01 \" role=\"tab\" tabindex=\"0\"><div class=\"uagb-faq-questions-button uagb-faq-questions\">\t\t\t<span class=\"uagb-icon uagb-faq-icon-wrap\">\n\t\t\t\t\t\t\t\t<svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox= \"0 0 448 512\"><path d=\"M432 256c0 17.69-14.33 32.01-32 32.01H256v144c0 17.69-14.33 31.99-32 31.99s-32-14.3-32-31.99v-144H48c-17.67 0-32-14.32-32-32.01s14.33-31.99 32-31.99H192v-144c0-17.69 14.33-32.01 32-32.01s32 14.32 32 32.01v144h144C417.7 224 432 238.3 432 256z\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t<span class=\"uagb-icon-active uagb-faq-icon-wrap\">\n\t\t\t\t\t\t\t\t<svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox= \"0 0 448 512\"><path d=\"M400 288h-352c-17.69 0-32-14.32-32-32.01s14.31-31.99 32-31.99h352c17.69 0 32 14.3 32 31.99S417.7 288 400 288z\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/span>\n\t\t\t<h3 class=\"uagb-question\">Un planning fonctionne-t-il pour des activit\u00e9s r\u00e9currentes ?<\/h3><\/div><div class=\"uagb-faq-content\"><p>Oui, \u00e0 condition que la p\u00e9riode et les livrables soient d\u00e9finis. Les t\u00e2ches r\u00e9currentes demandent en revanche une r\u00e9vision r\u00e9guli\u00e8re de la capacit\u00e9 et des priorit\u00e9s, plus fr\u00e9quente que pour un projet ponctuel.<\/p><\/div><\/div><div class=\"wp-block-uagb-faq-child uagb-faq-child__outer-wrap uagb-faq-item uagb-block-4838ed27 \" role=\"tab\" tabindex=\"0\"><div class=\"uagb-faq-questions-button uagb-faq-questions\">\t\t\t<span class=\"uagb-icon uagb-faq-icon-wrap\">\n\t\t\t\t\t\t\t\t<svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox= \"0 0 448 512\"><path d=\"M432 256c0 17.69-14.33 32.01-32 32.01H256v144c0 17.69-14.33 31.99-32 31.99s-32-14.3-32-31.99v-144H48c-17.67 0-32-14.32-32-32.01s14.33-31.99 32-31.99H192v-144c0-17.69 14.33-32.01 32-32.01s32 14.32 32 32.01v144h144C417.7 224 432 238.3 432 256z\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t<span class=\"uagb-icon-active uagb-faq-icon-wrap\">\n\t\t\t\t\t\t\t\t<svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox= \"0 0 448 512\"><path d=\"M400 288h-352c-17.69 0-32-14.32-32-32.01s14.31-31.99 32-31.99h352c17.69 0 32 14.3 32 31.99S417.7 288 400 288z\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/span>\n\t\t\t<h3 class=\"uagb-question\">Comment savoir si le planning fonctionne ?<\/h3><\/div><div class=\"uagb-faq-content\"><p>V\u00e9rifiez que l&#8217;\u00e9quipe identifie facilement la prochaine \u00e9ch\u00e9ance, son responsable et les blocages en cours. Comparez les dates et l&#8217;effort pr\u00e9vus aux dates r\u00e9elles, et utilisez les \u00e9carts pour affiner les prochaines estimations.<\/p><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>La planification de projet consiste \u00e0 organiser les t\u00e2ches, les responsables, les d\u00e9lais et les ressources d\u2019un projet avant son ex\u00e9cution. Elle combine estimations, d\u00e9pendances et disponibilit\u00e9 r\u00e9elle de l\u2019\u00e9quipe pour fixer des dates tenables.<\/p>\n","protected":false},"author":50,"featured_media":66123,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[736],"tags":[],"class_list":["post-66219","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gestion-de-projets-et-taches"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Planification de projet : construire un planning fiable<\/title>\n<meta name=\"description\" content=\"La planification de projet consiste \u00e0 organiser les t\u00e2ches, les d\u00e9lais et les ressources d\u2019un projet avant son ex\u00e9cution.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Planification de projet : construire un planning fiable\" \/>\n<meta property=\"og:description\" content=\"La planification de projet consiste \u00e0 organiser les t\u00e2ches, les d\u00e9lais et les ressources d\u2019un projet avant son ex\u00e9cution.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/\" \/>\n<meta property=\"og:site_name\" content=\"Blog de Recursos Humanos de Bizneo HR: pr\u00e1ctico y actual\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-22T07:03:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T07:03:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Cronograma-de-projetos.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Antoine Destrument\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Antoine Destrument\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/\"},\"author\":{\"name\":\"Antoine Destrument\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#\\\/schema\\\/person\\\/b64c2837f8e507ff08bb119a23fcb096\"},\"headline\":\"Planification de projet : comment construire un planning fiable en 7 \u00e9tapes\",\"datePublished\":\"2026-10-22T07:03:51+00:00\",\"dateModified\":\"2026-10-22T07:03:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/\"},\"wordCount\":1840,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Cronograma-de-projetos.png\",\"articleSection\":[\"Gestion de projets et taches\"],\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/\",\"url\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/\",\"name\":\"Planification de projet : construire un planning fiable\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Cronograma-de-projetos.png\",\"datePublished\":\"2026-10-22T07:03:51+00:00\",\"dateModified\":\"2026-10-22T07:03:52+00:00\",\"description\":\"La planification de projet consiste \u00e0 organiser les t\u00e2ches, les d\u00e9lais et les ressources d\u2019un projet avant son ex\u00e9cution.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Cronograma-de-projetos.png\",\"contentUrl\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Cronograma-de-projetos.png\",\"width\":1672,\"height\":941,\"caption\":\"Cronograma de projeto\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/planification-de-projet\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gestion de projets et taches\",\"item\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/category\\\/gestion-de-projets-et-taches\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Planification de projet : comment construire un planning fiable en 7 \u00e9tapes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/\",\"name\":\"Blog de Recursos Humanos de Bizneo HR: pr\u00e1ctico y actual\",\"description\":\"Todo sobre actualidad, herramientas y tecnolog\u00eda  para optimizar la gesti\u00f3n del talento humano\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#organization\",\"name\":\"Bizneo HR\",\"url\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/Icono-Logo-Bizneo-HR.png\",\"contentUrl\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/Icono-Logo-Bizneo-HR.png\",\"width\":834,\"height\":834,\"caption\":\"Bizneo HR\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#\\\/schema\\\/person\\\/b64c2837f8e507ff08bb119a23fcb096\",\"name\":\"Antoine Destrument\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/68521b539bef2722fa179bd83cfff8160f11d397804d65ba4a229efd21bac2e3?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/68521b539bef2722fa179bd83cfff8160f11d397804d65ba4a229efd21bac2e3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/68521b539bef2722fa179bd83cfff8160f11d397804d65ba4a229efd21bac2e3?s=96&d=mm&r=g\",\"caption\":\"Antoine Destrument\"},\"url\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/author\\\/antoine\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Planification de projet : construire un planning fiable","description":"La planification de projet consiste \u00e0 organiser les t\u00e2ches, les d\u00e9lais et les ressources d\u2019un projet avant son ex\u00e9cution.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"es_ES","og_type":"article","og_title":"Planification de projet : construire un planning fiable","og_description":"La planification de projet consiste \u00e0 organiser les t\u00e2ches, les d\u00e9lais et les ressources d\u2019un projet avant son ex\u00e9cution.","og_url":"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/","og_site_name":"Blog de Recursos Humanos de Bizneo HR: pr\u00e1ctico y actual","article_published_time":"2026-10-22T07:03:51+00:00","article_modified_time":"2026-10-22T07:03:52+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Cronograma-de-projetos.png","type":"image\/png"}],"author":"Antoine Destrument","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Antoine Destrument","Tiempo de lectura":"9 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/#article","isPartOf":{"@id":"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/"},"author":{"name":"Antoine Destrument","@id":"https:\/\/www.bizneo.com\/blog\/#\/schema\/person\/b64c2837f8e507ff08bb119a23fcb096"},"headline":"Planification de projet : comment construire un planning fiable en 7 \u00e9tapes","datePublished":"2026-10-22T07:03:51+00:00","dateModified":"2026-10-22T07:03:52+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/"},"wordCount":1840,"commentCount":0,"publisher":{"@id":"https:\/\/www.bizneo.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Cronograma-de-projetos.png","articleSection":["Gestion de projets et taches"],"inLanguage":"es","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/","url":"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/","name":"Planification de projet : construire un planning fiable","isPartOf":{"@id":"https:\/\/www.bizneo.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/#primaryimage"},"image":{"@id":"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Cronograma-de-projetos.png","datePublished":"2026-10-22T07:03:51+00:00","dateModified":"2026-10-22T07:03:52+00:00","description":"La planification de projet consiste \u00e0 organiser les t\u00e2ches, les d\u00e9lais et les ressources d\u2019un projet avant son ex\u00e9cution.","breadcrumb":{"@id":"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/#primaryimage","url":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Cronograma-de-projetos.png","contentUrl":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Cronograma-de-projetos.png","width":1672,"height":941,"caption":"Cronograma de projeto"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bizneo.com\/blog\/fr\/planification-de-projet\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bizneo.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Gestion de projets et taches","item":"https:\/\/www.bizneo.com\/blog\/fr\/category\/gestion-de-projets-et-taches\/"},{"@type":"ListItem","position":3,"name":"Planification de projet : comment construire un planning fiable en 7 \u00e9tapes"}]},{"@type":"WebSite","@id":"https:\/\/www.bizneo.com\/blog\/#website","url":"https:\/\/www.bizneo.com\/blog\/","name":"Blog de Recursos Humanos de Bizneo HR: pr\u00e1ctico y actual","description":"Todo sobre actualidad, herramientas y tecnolog\u00eda  para optimizar la gesti\u00f3n del talento humano","publisher":{"@id":"https:\/\/www.bizneo.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.bizneo.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.bizneo.com\/blog\/#organization","name":"Bizneo HR","url":"https:\/\/www.bizneo.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.bizneo.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2020\/09\/Icono-Logo-Bizneo-HR.png","contentUrl":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2020\/09\/Icono-Logo-Bizneo-HR.png","width":834,"height":834,"caption":"Bizneo HR"},"image":{"@id":"https:\/\/www.bizneo.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.bizneo.com\/blog\/#\/schema\/person\/b64c2837f8e507ff08bb119a23fcb096","name":"Antoine Destrument","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/68521b539bef2722fa179bd83cfff8160f11d397804d65ba4a229efd21bac2e3?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/68521b539bef2722fa179bd83cfff8160f11d397804d65ba4a229efd21bac2e3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/68521b539bef2722fa179bd83cfff8160f11d397804d65ba4a229efd21bac2e3?s=96&d=mm&r=g","caption":"Antoine Destrument"},"url":"https:\/\/www.bizneo.com\/blog\/author\/antoine\/"}]}},"spectra_custom_meta":{"_uagb_previous_block_counts":["a:90:{s:21:\"uagb\/advanced-heading\";i:1;s:15:\"uagb\/blockquote\";i:0;s:12:\"uagb\/buttons\";i:0;s:18:\"uagb\/buttons-child\";i:0;s:19:\"uagb\/call-to-action\";i:0;s:15:\"uagb\/cf7-styler\";i:0;s:11:\"uagb\/column\";i:0;s:12:\"uagb\/columns\";i:0;s:14:\"uagb\/container\";i:0;s:21:\"uagb\/content-timeline\";i:0;s:27:\"uagb\/content-timeline-child\";i:0;s:14:\"uagb\/countdown\";i:0;s:12:\"uagb\/counter\";i:0;s:8:\"uagb\/faq\";i:1;s:14:\"uagb\/faq-child\";i:3;s:10:\"uagb\/forms\";i:0;s:17:\"uagb\/forms-accept\";i:0;s:19:\"uagb\/forms-checkbox\";i:0;s:15:\"uagb\/forms-date\";i:0;s:16:\"uagb\/forms-email\";i:0;s:17:\"uagb\/forms-hidden\";i:0;s:15:\"uagb\/forms-name\";i:0;s:16:\"uagb\/forms-phone\";i:0;s:16:\"uagb\/forms-radio\";i:0;s:17:\"uagb\/forms-select\";i:0;s:19:\"uagb\/forms-textarea\";i:0;s:17:\"uagb\/forms-toggle\";i:0;s:14:\"uagb\/forms-url\";i:0;s:14:\"uagb\/gf-styler\";i:0;s:15:\"uagb\/google-map\";i:0;s:11:\"uagb\/how-to\";i:0;s:16:\"uagb\/how-to-step\";i:0;s:9:\"uagb\/icon\";i:0;s:14:\"uagb\/icon-list\";i:0;s:20:\"uagb\/icon-list-child\";i:0;s:10:\"uagb\/image\";i:0;s:18:\"uagb\/image-gallery\";i:0;s:13:\"uagb\/info-box\";i:0;s:18:\"uagb\/inline-notice\";i:0;s:11:\"uagb\/lottie\";i:0;s:21:\"uagb\/marketing-button\";i:0;s:10:\"uagb\/modal\";i:0;s:18:\"uagb\/popup-builder\";i:0;s:16:\"uagb\/post-button\";i:0;s:18:\"uagb\/post-carousel\";i:0;s:17:\"uagb\/post-excerpt\";i:0;s:14:\"uagb\/post-grid\";i:0;s:15:\"uagb\/post-image\";i:0;s:17:\"uagb\/post-masonry\";i:0;s:14:\"uagb\/post-meta\";i:0;s:18:\"uagb\/post-taxonomy\";i:0;s:18:\"uagb\/post-timeline\";i:0;s:15:\"uagb\/post-title\";i:0;s:20:\"uagb\/restaurant-menu\";i:0;s:26:\"uagb\/restaurant-menu-child\";i:0;s:11:\"uagb\/review\";i:0;s:12:\"uagb\/section\";i:0;s:14:\"uagb\/separator\";i:0;s:11:\"uagb\/slider\";i:0;s:17:\"uagb\/slider-child\";i:0;s:17:\"uagb\/social-share\";i:0;s:23:\"uagb\/social-share-child\";i:0;s:16:\"uagb\/star-rating\";i:0;s:23:\"uagb\/sure-cart-checkout\";i:0;s:22:\"uagb\/sure-cart-product\";i:0;s:15:\"uagb\/sure-forms\";i:0;s:22:\"uagb\/table-of-contents\";i:0;s:9:\"uagb\/tabs\";i:0;s:15:\"uagb\/tabs-child\";i:0;s:18:\"uagb\/taxonomy-list\";i:0;s:9:\"uagb\/team\";i:0;s:16:\"uagb\/testimonial\";i:0;s:14:\"uagb\/wp-search\";i:0;s:19:\"uagb\/instagram-feed\";i:0;s:10:\"uagb\/login\";i:0;s:17:\"uagb\/loop-builder\";i:0;s:18:\"uagb\/loop-category\";i:0;s:20:\"uagb\/loop-pagination\";i:0;s:15:\"uagb\/loop-reset\";i:0;s:16:\"uagb\/loop-search\";i:0;s:14:\"uagb\/loop-sort\";i:0;s:17:\"uagb\/loop-wrapper\";i:0;s:13:\"uagb\/register\";i:0;s:19:\"uagb\/register-email\";i:0;s:24:\"uagb\/register-first-name\";i:0;s:23:\"uagb\/register-last-name\";i:0;s:22:\"uagb\/register-password\";i:0;s:30:\"uagb\/register-reenter-password\";i:0;s:19:\"uagb\/register-terms\";i:0;s:22:\"uagb\/register-username\";i:0;}"],"_thumbnail_id":["66123"],"_yoast_wpseo_title":["Planification de projet : construire un planning fiable"],"_yoast_wpseo_metadesc":["La planification de projet consiste \u00e0 organiser les t\u00e2ches, les d\u00e9lais et les ressources d\u2019un projet avant son ex\u00e9cution."],"_yoast_wpseo_focuskw":["Planification de projet"],"_yoast_wpseo_primary_category":["736"],"_edit_lock":["1792652674:50"],"_edit_last":["50"],"_yoast_wpseo_linkdex":["86"],"_yoast_wpseo_content_score":["90"],"_yoast_wpseo_seo_title_score":["100"],"_yoast_wpseo_meta_description_score":["100"],"_yoast_wpseo_estimated-reading-time-minutes":["9"],"_uag_css_file_name":["uag-css-66219.css"],"_uag_page_assets":["a:9:{s:3:\"css\";s:7012:\".wp-block-uagb-advanced-heading h1,.wp-block-uagb-advanced-heading h2,.wp-block-uagb-advanced-heading h3,.wp-block-uagb-advanced-heading h4,.wp-block-uagb-advanced-heading h5,.wp-block-uagb-advanced-heading h6,.wp-block-uagb-advanced-heading p,.wp-block-uagb-advanced-heading div{word-break:break-word}.wp-block-uagb-advanced-heading .uagb-heading-text{margin:0}.wp-block-uagb-advanced-heading .uagb-desc-text{margin:0}.wp-block-uagb-advanced-heading .uagb-separator{font-size:0;border-top-style:solid;display:inline-block;margin:0 0 10px 0}.wp-block-uagb-advanced-heading .uagb-highlight{color:#f78a0c;border:0;transition:all .3s ease}.uag-highlight-toolbar{border-left:0;border-top:0;border-bottom:0;border-radius:0;border-right-color:#1e1e1e}.uag-highlight-toolbar .components-button{border-radius:0;outline:none}.uag-highlight-toolbar .components-button.is-primary{color:#fff}.wp-block-uagb-faq{width:100%}.wp-block-uagb-faq.uagb-faq-layout-accordion .uagb-faq-child__outer-wrap .uagb-faq-questions-button{cursor:pointer}.wp-block-uagb-faq .uagb-faq-content{margin-bottom:0}.wp-block-uagb-faq .uagb-faq-content p{margin:auto}.uagb-faq-layout-grid.uagb-faq-equal-height.uagb-faq__wrap .uagb-faq-child__outer-wrap,.uagb-faq-layout-grid.uagb-faq-equal-height.uagb-faq__wrap .uagb-faq-item{height:100%}body[class*=astra] .uagb-faq-questions{line-height:normal}.uagb-faq-item{overflow:hidden}.wp-block-uagb-faq-child .uagb-faq-questions-button{display:flex;align-items:center}.wp-block-uagb-faq-child .uagb-faq-questions-button .uagb-faq-icon-wrap{display:flex;align-items:center}.wp-block-uagb-faq-child .uagb-faq-questions-button .uagb-question{width:100%;margin-top:0;margin-bottom:0}.wp-block-uagb-faq-child .uagb-icon svg,.wp-block-uagb-faq-child .uagb-icon-active svg{width:15px;height:15px;font-size:15px}.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap.uagb-faq-item .uagb-icon-active,.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap.uagb-faq-item.uagb-faq-item-active .uagb-icon,.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap .uagb-faq-item .uagb-icon-active,.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap .uagb-faq-item.uagb-faq-item-active .uagb-icon{display:none;width:0;height:0;margin:0}.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap.uagb-faq-item .uagb-icon,.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap.uagb-faq-item.uagb-faq-item-active .uagb-icon-active,.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap .uagb-faq-item .uagb-icon,.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap .uagb-faq-item.uagb-faq-item-active .uagb-icon-active{display:flex;width:auto;height:auto}.uagb-faq-layout-grid .uagb-faq-child__outer-wrap.uagb-faq-item .uagb-icon,.uagb-faq-layout-grid .uagb-faq-child__outer-wrap.uagb-faq-item.uagb-faq-item-active .uagb-icon-active,.uagb-faq-layout-grid .uagb-faq-child__outer-wrap .uagb-faq-item .uagb-icon,.uagb-faq-layout-grid .uagb-faq-child__outer-wrap .uagb-faq-item.uagb-faq-item-active .uagb-icon-active{display:none}.uagb-faq-layout-grid .uagb-faq-child__outer-wrap.uagb-faq-item span.uagb-icon-active.uagb-faq-icon-wrap,.uagb-faq-layout-grid .uagb-faq-child__outer-wrap.uagb-faq-item.uagb-faq-item-active .uagb-icon-active,.uagb-faq-layout-grid .uagb-faq-child__outer-wrap .uagb-faq-item span.uagb-icon-active.uagb-faq-icon-wrap,.uagb-faq-layout-grid .uagb-faq-child__outer-wrap .uagb-faq-item.uagb-faq-item-active .uagb-icon-active{display:none}.wp-block-uagb-advanced-heading.uagb-block-3182e22e.wp-block-uagb-advanced-heading .uagb-desc-text{margin-bottom: 15px;}.wp-block-uagb-advanced-heading.uagb-block-3182e22e.wp-block-uagb-advanced-heading .uagb-highlight{font-style: normal;font-weight: Default;background: #007cba;color: #fff;-webkit-text-fill-color: #fff;}.wp-block-uagb-advanced-heading.uagb-block-3182e22e.wp-block-uagb-advanced-heading .uagb-highlight::-moz-selection{color: #fff;background: #007cba;-webkit-text-fill-color: #fff;}.wp-block-uagb-advanced-heading.uagb-block-3182e22e.wp-block-uagb-advanced-heading .uagb-highlight::selection{color: #fff;background: #007cba;-webkit-text-fill-color: #fff;}.uagb-block-d75656b6 .uagb-icon svg{width: 12px;height: 12px;font-size: 12px;}.uagb-block-d75656b6 .uagb-icon-active svg{width: 12px;height: 12px;font-size: 12px;}.uagb-block-d75656b6 .uagb-faq-child__outer-wrap{margin-bottom: 10px;}.uagb-block-d75656b6 .uagb-faq-item{border-top-width: 1px;border-left-width: 1px;border-right-width: 1px;border-bottom-width: 1px;border-top-left-radius: 2px;border-top-right-radius: 2px;border-bottom-left-radius: 2px;border-bottom-right-radius: 2px;border-color: #D2D2D2;border-style: solid;}.uagb-block-d75656b6 .uagb-faq-questions-button{padding-top: 10px;padding-bottom: 10px;padding-right: 10px;padding-left: 10px;}.uagb-block-d75656b6 .uagb-faq-content{padding-top: 10px;padding-bottom: 10px;padding-right: 10px;padding-left: 10px;}.uagb-block-d75656b6 .uagb-faq-content span{margin-top: 10px;margin-bottom: 10px;margin-right: 10px;margin-left: 10px;}.uagb-block-d75656b6.uagb-faq-icon-row .uagb-faq-item .uagb-faq-icon-wrap{margin-right: 10px;}.uagb-block-d75656b6.uagb-faq-icon-row-reverse .uagb-faq-item .uagb-faq-icon-wrap{margin-left: 10px;}.uagb-block-d75656b6 .uagb-faq-item .uagb-faq-questions-button.uagb-faq-questions{flex-direction: row;}.uagb-block-d75656b6 .wp-block-uagb-faq-child.uagb-faq-child__outer-wrap .uagb-faq-content {display: none;}@media only screen and (max-width: 976px) {.uagb-block-d75656b6.uagb-faq-icon-row .uagb-faq-item .uagb-faq-icon-wrap{margin-right: 10px;}.uagb-block-d75656b6.uagb-faq-icon-row-reverse .uagb-faq-item .uagb-faq-icon-wrap{margin-left: 10px;}.uagb-block-d75656b6 .uagb-faq-questions-button{padding-top: 10px;padding-bottom: 10px;padding-right: 10px;padding-left: 10px;}.uagb-block-d75656b6 .uagb-faq-content{padding-top: 10px;padding-bottom: 10px;padding-right: 10px;padding-left: 10px;}.uagb-block-d75656b6 .uagb-faq-content span{margin-top: 10px;margin-bottom: 10px;margin-right: 10px;margin-left: 10px;}.uagb-block-d75656b6 .uagb-faq-item{border-style: solid;border-color: #D2D2D2;}}@media only screen and (max-width: 767px) {.uagb-block-d75656b6.uagb-faq-icon-row .uagb-faq-item .uagb-faq-icon-wrap{margin-right: 10px;}.uagb-block-d75656b6 .uagb-faq-item{border-style: solid;border-color: #D2D2D2;}.uagb-block-d75656b6.uagb-faq-icon-row-reverse .uagb-faq-item .uagb-faq-icon-wrap{margin-left: 10px;}.uagb-block-d75656b6 .uagb-faq-questions-button{padding-top: 10px;padding-bottom: 10px;padding-right: 10px;padding-left: 10px;}.uagb-block-d75656b6 .uagb-faq-content{padding-top: 10px;padding-bottom: 10px;padding-right: 10px;padding-left: 10px;}.uagb-block-d75656b6 .uagb-faq-content span{margin-top: 10px;margin-bottom: 10px;margin-right: 10px;margin-left: 10px;}}.uag-blocks-common-selector{z-index:var(--z-index-desktop) !important}@media(max-width: 976px){.uag-blocks-common-selector{z-index:var(--z-index-tablet) !important}}@media(max-width: 767px){.uag-blocks-common-selector{z-index:var(--z-index-mobile) !important}}\";s:2:\"js\";s:0:\"\";s:18:\"current_block_list\";a:12:{i:0;s:14:\"core\/paragraph\";i:1;s:12:\"core\/heading\";i:2;s:9:\"core\/list\";i:3;s:14:\"core\/list-item\";i:4;s:10:\"core\/image\";i:5;s:9:\"core\/html\";i:6;s:10:\"core\/table\";i:7;s:21:\"uagb\/advanced-heading\";i:8;s:8:\"uagb\/faq\";i:9;s:14:\"uagb\/faq-child\";i:10;s:12:\"core\/details\";i:11;s:14:\"core\/shortcode\";}s:8:\"uag_flag\";b:1;s:11:\"uag_version\";s:10:\"1793020894\";s:6:\"gfonts\";a:0:{}s:10:\"gfonts_url\";s:0:\"\";s:12:\"gfonts_files\";a:0:{}s:14:\"uag_faq_layout\";b:1;}"]},"uagb_featured_image_src":{"full":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Cronograma-de-projetos.png",1672,941,false],"thumbnail":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Cronograma-de-projetos-150x150.png",150,150,true],"medium":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Cronograma-de-projetos-300x169.png",300,169,true],"medium_large":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Cronograma-de-projetos-768x432.png",768,432,true],"large":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Cronograma-de-projetos-1024x576.png",1024,576,true],"1536x1536":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Cronograma-de-projetos-1536x864.png",1536,864,true],"2048x2048":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Cronograma-de-projetos.png",1672,941,false]},"uagb_author_info":{"display_name":"Antoine Destrument","author_link":"https:\/\/www.bizneo.com\/blog\/author\/antoine\/"},"uagb_comment_info":0,"uagb_excerpt":"La planification de projet consiste \u00e0 organiser les t\u00e2ches, les responsables, les d\u00e9lais et les ressources d\u2019un projet avant son ex\u00e9cution. Elle combine estimations, d\u00e9pendances et disponibilit\u00e9 r\u00e9elle de l\u2019\u00e9quipe pour fixer des dates tenables.","_links":{"self":[{"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/posts\/66219","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/users\/50"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/comments?post=66219"}],"version-history":[{"count":7,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/posts\/66219\/revisions"}],"predecessor-version":[{"id":66260,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/posts\/66219\/revisions\/66260"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/media\/66123"}],"wp:attachment":[{"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/media?parent=66219"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/categories?post=66219"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/tags?post=66219"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}