{"id":66190,"date":"2026-10-21T10:42:09","date_gmt":"2026-10-21T09:42:09","guid":{"rendered":"https:\/\/www.bizneo.com\/blog\/?p=66190"},"modified":"2026-10-21T10:42:10","modified_gmt":"2026-10-21T09:42:10","slug":"tableau-kanban","status":"publish","type":"post","link":"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/","title":{"rendered":"Tableau Kanban : d\u00e9finition et comment en cr\u00e9er un en 6 \u00e9tapes"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Un <strong>tableau Kanban<\/strong> est un outil de gestion visuelle qui organise les t\u00e2ches d&#8217;une \u00e9quipe par colonnes, de la demande initiale jusqu&#8217;\u00e0 sa cl\u00f4ture. Il permet de voir en un coup d&#8217;\u0153il ce qui avance et ce qui bloque.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Une \u00e9quipe de trois personnes qui limite son travail en cours \u00e0 <strong>trois t\u00e2ches par colonne<\/strong> peut suivre jusqu&#8217;\u00e0 cinq cartes ouvertes en m\u00eame temps, sans r\u00e9union de suivi quotidienne.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">C&#8217;est tout l&#8217;int\u00e9r\u00eat de la m\u00e9thode : <strong>rendre visible ce qui, autrement, ne se voit qu&#8217;au moment du retard.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu&#8217;est-ce qu&#8217;un tableau Kanban ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Un tableau Kanban est une <strong>repr\u00e9sentation visuelle du flux de travail<\/strong> d&#8217;une \u00e9quipe, sous forme de colonnes et de cartes, physiques ou num\u00e9riques. Chaque colonne correspond \u00e0 une \u00e9tape du processus.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dans la <a href=\"https:\/\/www.bizneo.com\/blog\/fr\/gestion-equipe-travail\/\" data-wpel-link=\"internal\" target=\"_blank\">gestion d&#8217;\u00e9quipe<\/a>, le Kanban organise le travail comme un flux : <strong>une demande entre, traverse des \u00e9tapes et est men\u00e9e \u00e0 son terme.<\/strong> Selon le <a href=\"https:\/\/kanbanguides.org\/fr\/the-kanban-guide\/2025.5\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\" data-wpel-link=\"external\">Kanban Guide<\/a>, la m\u00e9thode consiste \u00e0 visualiser, g\u00e9rer et am\u00e9liorer ce flux de travail.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le terme vient du japonais et signifie <strong>\u00e9tiquette<\/strong>. La m\u00e9thode a \u00e9t\u00e9 d\u00e9velopp\u00e9e dans les usines Toyota par l&#8217;ing\u00e9nieur <strong>Taiichi Ohno<\/strong> pour synchroniser la production avec la demande r\u00e9elle, avant d&#8217;\u00eatre reprise dans la gestion de projet et le d\u00e9veloppement logiciel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Au-del\u00e0 de la cr\u00e9ation du tableau, appliquer le Kanban suppose de d\u00e9finir comment l&#8217;\u00e9quipe <strong>re\u00e7oit, ex\u00e9cute et termine<\/strong> les demandes, en respectant sa capacit\u00e9 r\u00e9elle.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La m\u00e9thode s&#8217;applique dans des services avec un flux continu de demandes : marketing, op\u00e9rations, RH. Pour fonctionner, le tableau doit rester <strong>\u00e0 jour<\/strong> et ses r\u00e8gles doivent emp\u00eacher de d\u00e9marrer plus de t\u00e2ches que l&#8217;\u00e9quipe ne peut en traiter.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1536\" height=\"1024\" src=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban.png\" alt=\"Tableau Kanban\" class=\"wp-image-66193\" srcset=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban.png 1536w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban-300x200.png 300w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban-1024x683.png 1024w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban-768x512.png 768w\" sizes=\"(max-width: 1536px) 100vw, 1536px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Comment fonctionne un tableau Kanban ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La m\u00e9thode repose sur trois \u00e9l\u00e9ments et un flux continu de mouvement des cartes :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Le tableau :<\/strong> la base visuelle, divis\u00e9e en colonnes qui repr\u00e9sentent les \u00e9tapes du processus.<\/li>\n\n\n\n<li><strong>Les cartes :<\/strong> chacune repr\u00e9sente une t\u00e2che ou un projet \u00e0 ex\u00e9cuter.<\/li>\n\n\n\n<li><strong>Le flux tir\u00e9 (<em>pull system<\/em>) :<\/strong> une t\u00e2che n&#8217;avance que lorsqu&#8217;il existe une capacit\u00e9 r\u00e9elle pour la traiter, ce qui \u00e9vite la surcharge.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.bizneo.com\/fr\/gestion-de-projets-et-taches\/\" data-wpel-link=\"internal\" target=\"_blank\"><img decoding=\"async\" width=\"1024\" height=\"750\" src=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban-projets-1024x750.webp\" alt=\"Tableau kanban \" class=\"wp-image-66198\" srcset=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban-projets-1024x750.webp 1024w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban-projets-300x220.webp 300w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban-projets-768x562.webp 768w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/tableau-kanban-projets.webp 1500w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Que doit contenir une carte Kanban ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Une carte Kanban doit r\u00e9unir les <strong>informations essentielles<\/strong> pour que n&#8217;importe quel membre de l&#8217;\u00e9quipe comprenne la t\u00e2che et sache qui en est responsable.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Titre de la t\u00e2che :<\/strong> un texte court et une action directe.<\/li>\n\n\n\n<li><strong>Responsable :<\/strong> la personne ou l&#8217;\u00e9quipe charg\u00e9e de l&#8217;ex\u00e9cuter.<\/li>\n\n\n\n<li><strong>\u00c9ch\u00e9ance :<\/strong> la date limite pour terminer la t\u00e2che.<\/li>\n\n\n\n<li><strong>Priorit\u00e9 :<\/strong> une indication visuelle, par exemple haute, moyenne, basse.<\/li>\n\n\n\n<li><strong>\u00c9tape :<\/strong> repr\u00e9sent\u00e9e par la colonne o\u00f9 se trouve la carte.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">En compl\u00e9ment, une description d\u00e9taill\u00e9e, une checklist de sous-t\u00e2ches ou des \u00e9tiquettes par type de travail aident \u00e0 filtrer et suivre l&#8217;avancement sans ouvrir chaque carte.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Comment fonctionnent le flux tir\u00e9 et la limite de WIP ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Dans un syst\u00e8me tir\u00e9, <strong>une nouvelle t\u00e2che d\u00e9marre quand une capacit\u00e9 existe<\/strong> pour la traiter, dans le respect des priorit\u00e9s. Cela \u00e9vite de surcharger des personnes d\u00e9j\u00e0 occup\u00e9es.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La <strong>limite de WIP<\/strong> (work in progress, travail en cours) fixe combien de t\u00e2ches peuvent \u00eatre d\u00e9marr\u00e9es sans \u00eatre termin\u00e9es. Elle r\u00e9duit les <strong>goulots d&#8217;\u00e9tranglement<\/strong> et \u00e9vite la surcharge de travail. En atteignant cette limite, la priorit\u00e9 est de <strong>d\u00e9bloquer ou terminer<\/strong> un \u00e9l\u00e9ment existant plut\u00f4t que d&#8217;en d\u00e9marrer un nouveau.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Une \u00e9quipe de trois personnes peut par exemple limiter \u00ab En cours \u00bb \u00e0 trois cartes et \u00ab En r\u00e9vision \u00bb \u00e0 deux. <strong>Cela permet de suivre jusqu&#8217;\u00e0 cinq \u00e9l\u00e9ments d\u00e9marr\u00e9s<\/strong> dans ce flux, r\u00e9vision comprise.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ces chiffres sont un <strong>point de d\u00e9part, pas une formule universelle<\/strong>. Si la r\u00e9vision accumule des \u00e9l\u00e9ments, l&#8217;\u00e9quipe doit v\u00e9rifier la disponibilit\u00e9 de la personne qui valide, la taille des t\u00e2ches et les crit\u00e8res d&#8217;entr\u00e9e.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.bizneo.com\/fr\/gestion-de-projets-et-taches\/\" data-wpel-link=\"internal\" target=\"_blank\"><img decoding=\"async\" width=\"1024\" height=\"702\" src=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/arborescence-projets-1024x702.webp\" alt=\"Arborescence des projets\" class=\"wp-image-66202\" srcset=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/arborescence-projets-1024x702.webp 1024w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/arborescence-projets-300x206.webp 300w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/arborescence-projets-768x527.webp 768w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/arborescence-projets.webp 1500w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Comment cr\u00e9er un tableau Kanban en 6 \u00e9tapes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Pour cr\u00e9er un tableau Kanban, choisissez un flux et un objectif, d\u00e9finissez les \u00e9tapes, cr\u00e9ez des cartes avec des crit\u00e8res clairs, fixez des priorit\u00e9s et des limites, puis ajustez le processus selon les r\u00e9sultats.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Choisir un flux et un objectif concret<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Commencez par un service r\u00e9current<\/strong>, comme les demandes clients, la production de rapports ou l&#8217;int\u00e9gration de nouveaux salari\u00e9s. \u00c9vitez de placer toutes les activit\u00e9s de l&#8217;entreprise sur le premier tableau.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">D\u00e9finissez le probl\u00e8me \u00e0 r\u00e9soudre : r\u00e9duire les demandes oubli\u00e9es, visualiser le d\u00e9lai de validation ou diminuer le nombre de t\u00e2ches simultan\u00e9es. Cet objectif oriente les \u00e9tapes et les donn\u00e9es \u00e0 afficher.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Dessiner les \u00e9tapes existantes<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">\u00c9changez avec les personnes qui ex\u00e9cutent le travail et <strong>cartographiez le chemin r\u00e9el<\/strong>, y compris les attentes importantes. Un mod\u00e8le de d\u00e9part peut \u00eatre \u00ab \u00c0 faire \u2192 En cours \u2192 En r\u00e9vision \u2192 Termin\u00e9 \u00bb.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">N&#8217;ajoutez une \u00e9tape que si elle aide \u00e0 prendre une d\u00e9cision. Si l&#8217;\u00e9quipe attend toujours une validation externe, cette attente doit rester visible sur le tableau.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. D\u00e9finir des crit\u00e8res d&#8217;entr\u00e9e et de sortie par colonne<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cr\u00e9ez une carte par livrable<\/strong> et indiquez le responsable. Fixez le minimum requis pour d\u00e9marrer : brief complet, mat\u00e9riel disponible, priorit\u00e9 d\u00e9finie.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mettez-vous d&#8217;accord sur ce que signifie terminer une t\u00e2che. \u00ab Envoy\u00e9 en r\u00e9vision \u00bb n&#8217;\u00e9quivaut pas \u00e0 \u00ab valid\u00e9 et livr\u00e9 \u00bb. Sans cet accord, chacun d\u00e9place les cartes selon ses propres crit\u00e8res.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Fixer les priorit\u00e9s, les limites et les exceptions<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Ordonnez la file des t\u00e2ches pr\u00eates \u00e0 d\u00e9marrer et d\u00e9cidez qui peut modifier cet ordre. Fixez des <strong>limites de WIP adapt\u00e9es \u00e0 la capacit\u00e9 r\u00e9elle<\/strong> de l&#8217;\u00e9quipe et rendez-les visibles.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mettez-vous aussi d&#8217;accord sur le traitement des urgences. Une demande exceptionnelle doit avoir un motif, un responsable de la d\u00e9cision et un impact explicite sur les autres livrables.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. Faire des points courts et r\u00e9guliers<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Passez en revue le tableau \u00e0 une fr\u00e9quence adapt\u00e9e au rythme des demandes. Pour une \u00e9quipe avec un mouvement quotidien, un \u00e9change bref par jour suffit souvent pour <strong>identifier les blocages et d\u00e9cider de la prochaine action<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Regardez d&#8217;abord les livrables proches de la fin et les cartes les plus anciennes. Demandez \u00ab que manque-t-il pour avancer ? \u00bb et \u00ab qui peut lever ce blocage ? \u00bb.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6. Mesurer et ajuster une r\u00e8gle \u00e0 la fois<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Enregistrez les dates de d\u00e9but et de fin<\/strong> et observez le volume livr\u00e9. Comparez des p\u00e9riodes avec des types de demandes similaires et notez les variations de capacit\u00e9, comme les cong\u00e9s.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Si les t\u00e2ches stagnent en r\u00e9vision, r\u00e9servez des cr\u00e9neaux d\u00e9di\u00e9s \u00e0 la validation ou am\u00e9liorez les crit\u00e8res d&#8217;entr\u00e9e. \u00c9valuez l&#8217;effet d&#8217;un changement avant d&#8217;en ajuster plusieurs \u00e0 la fois.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Exemple de tableau Kanban pour une \u00e9quipe<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Imaginez une \u00e9quipe de trois personnes qui pr\u00e9pare des livrables pour des clients et d\u00e9pend d&#8217;une personne charg\u00e9e de la validation. Le travail d\u00e9marre en entrant dans \u00ab En cours \u00bb et se termine apr\u00e8s validation et envoi.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th><strong>Colonne<\/strong><\/th><th><strong>Limite<\/strong><\/th><th><strong>Cartes au moment du point<\/strong><\/th><\/tr><\/thead><tbody><tr><td><strong>\u00c0 faire<\/strong><\/td><td>File prioris\u00e9e, hors WIP<\/td><td>Mettre \u00e0 jour la fiche du client Gamma (L\u00e9a), \u00e9ch\u00e9ance le 18 ; pr\u00e9parer le diagnostic du client Delta (Hugo), \u00e9ch\u00e9ance le 20<\/td><\/tr><tr><td><strong>En cours<\/strong><\/td><td>3<\/td><td>Consolider le rapport Alpha (L\u00e9a), \u00e9ch\u00e9ance le 15 ; revoir le p\u00e9rim\u00e8tre B\u00eata (Hugo), \u00e9ch\u00e9ance le 16 ; pr\u00e9parer la proposition Gamma (Camille), \u00e9ch\u00e9ance le 17<\/td><\/tr><tr><td><strong>En r\u00e9vision<\/strong><\/td><td>2<\/td><td>Valider le rapport Delta (Camille), r\u00e9vision d&#8217;In\u00e8s, \u00e9ch\u00e9ance le 14 ; approuver la proposition Alpha (Hugo), r\u00e9vision d&#8217;In\u00e8s, \u00e9ch\u00e9ance le 15<\/td><\/tr><tr><td><strong>Termin\u00e9<\/strong><\/td><td>Hors WIP<\/td><td>Diagnostic B\u00eata livr\u00e9 (L\u00e9a), valid\u00e9 et envoy\u00e9 le 12<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Le tableau compte <strong>cinq \u00e9l\u00e9ments d\u00e9marr\u00e9s<\/strong> et atteint la limite convenue. Si L\u00e9a termine le rapport Alpha, elle ne doit pas simplement l&#8217;ajouter \u00e0 une r\u00e9vision d\u00e9j\u00e0 pleine.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L&#8217;\u00e9quipe doit plut\u00f4t aider In\u00e8s \u00e0 finaliser une validation ou r\u00e9soudre ce qui emp\u00eache cette sortie. Supposons que \u00ab Valider le rapport Delta \u00bb d\u00e9pende d&#8217;une information du client.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>La carte continue de compter dans le WIP<\/strong>, avec le blocage identifi\u00e9 et la prochaine action : Camille relance le client le 14. La d\u00e9placer vers une colonne sans limite fausserait la vision r\u00e9elle du travail engag\u00e9.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Exemple de tableau Kanban pour l&#8217;onboarding RH<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pour l&#8217;int\u00e9gration d&#8217;un nouveau salari\u00e9, <strong>une carte peut repr\u00e9senter une personne<\/strong>, avec des \u00e9tapes comme \u00ab Pr\u00e9paration \u00bb, \u00ab Avant l&#8217;arriv\u00e9e \u00bb, \u00ab Int\u00e9gration en cours \u00bb et \u00ab Termin\u00e9e \u00bb.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le crit\u00e8re final peut r\u00e9unir les acc\u00e8s activ\u00e9s, la pr\u00e9sentation \u00e0 l&#8217;\u00e9quipe et les premi\u00e8res formations r\u00e9alis\u00e9es. Dans ce cas, le service RH, le manager et l&#8217;IT participent au flux, mais une seule personne doit coordonner chaque int\u00e9gration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Utilisez des checklists pour les t\u00e2ches et limitez l&#8217;acc\u00e8s aux informations personnelles. Les documents sensibles doivent rester dans un espace adapt\u00e9, sans exposition sur le tableau partag\u00e9.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"\/fr\/\" data-wpel-link=\"internal\" target=\"_blank\"><img decoding=\"async\" width=\"1500\" height=\"1052\" src=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/workflows-onboarding-offboarding.webp\" alt=\"Logiciel onboarding RH\" class=\"wp-image-44891\" srcset=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/workflows-onboarding-offboarding.webp 1500w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/workflows-onboarding-offboarding-300x210.webp 300w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/workflows-onboarding-offboarding-1024x718.webp 1024w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/workflows-onboarding-offboarding-768x539.webp 768w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/workflows-onboarding-offboarding-810x568.webp 810w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/workflows-onboarding-offboarding-1140x800.webp 1140w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Tableau physique, fichier ou logiciel : lequel choisir ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Le meilleur outil est celui que l&#8217;\u00e9quipe peut <strong>maintenir \u00e0 jour et consulter au moment de d\u00e9cider<\/strong>. Avant de choisir, \u00e9valuez le travail \u00e0 distance, le volume de demandes et le besoin d&#8217;historique.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th><strong>Option<\/strong><\/th><th><strong>Quand \u00e7a peut fonctionner<\/strong><\/th><th><strong>Point de vigilance<\/strong><\/th><\/tr><\/thead><tbody><tr><td><strong>Tableau physique<\/strong><\/td><td>\u00c9quipe sur site, flux simple, test initial<\/td><td>L&#8217;historique et l&#8217;acc\u00e8s \u00e0 distance demandent des solutions compl\u00e9mentaires<\/td><\/tr><tr><td><strong>Fichier (Excel, Sheets)<\/strong><\/td><td>Petit pilote ou suivi partag\u00e9 basique<\/td><td>Les mises \u00e0 jour et la tra\u00e7abilit\u00e9 d\u00e9pendent de la discipline de chacun<\/td><\/tr><tr><td><strong>Logiciel<\/strong><\/td><td>\u00c9quipes distribu\u00e9es, plusieurs projets ou d\u00e9pendances<\/td><td>V\u00e9rifier les fonctionnalit\u00e9s, les permissions et la facilit\u00e9 d&#8217;adoption<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Quand le tableau doit aussi refl\u00e9ter la capacit\u00e9 et le suivi de projet<\/strong>, le logiciel de <a href=\"https:\/\/www.bizneo.com\/fr\/gestion-de-projets-et-taches\/\" data-wpel-link=\"internal\" target=\"_blank\">gestion de projets et t\u00e2ches<\/a> de Bizneo HR r\u00e9unit la vue Kanban, les responsables, les \u00e9ch\u00e9ances et les d\u00e9pendances au m\u00eame endroit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le choix de l&#8217;outil ne remplace pas les r\u00e8gles d&#8217;\u00e9quipe. Les crit\u00e8res de fin de t\u00e2che, les priorit\u00e9s et les limites doivent rester compr\u00e9hensibles pour qui ex\u00e9cute et pour qui demande le travail.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Quels indicateurs suivre avec un tableau Kanban ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Quatre indicateurs aident \u00e0 comprendre le flux. Fixez les m\u00eames points de d\u00e9but et de fin pour que les chiffres restent comparables :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>WIP :<\/strong> nombre de t\u00e2ches d\u00e9marr\u00e9es et non termin\u00e9es, blocages inclus.<\/li>\n\n\n\n<li><strong>D\u00e9bit :<\/strong> nombre de t\u00e2ches termin\u00e9es sur une p\u00e9riode donn\u00e9e, par exemple une semaine.<\/li>\n\n\n\n<li><strong>\u00c2ge d&#8217;une t\u00e2che :<\/strong> temps \u00e9coul\u00e9 depuis le d\u00e9marrage d&#8217;une carte encore ouverte.<\/li>\n\n\n\n<li><strong>Temps de cycle :<\/strong> temps entre le d\u00e9but et la fin d&#8217;une t\u00e2che, attentes comprises.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Si une carte d\u00e9marre lundi et se termine jeudi, son temps de cycle couvre cet intervalle, m\u00eame si le travail effectif n&#8217;a demand\u00e9 que deux heures. <strong>Observez la distribution des temps<\/strong>, pas seulement la moyenne.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.bizneo.com\/fr\/gestion-de-projets-et-taches\/\" data-wpel-link=\"internal\" target=\"_blank\"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/calcul-capacite-equipe-1024x683.webp\" alt=\"Calcul automatique de la capacit\u00e9 de l'\u00e9quipe\" class=\"wp-image-66206\" srcset=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/calcul-capacite-equipe-1024x683.webp 1024w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/calcul-capacite-equipe-300x200.webp 300w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/calcul-capacite-equipe-768x512.webp 768w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/calcul-capacite-equipe.webp 1500w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">G\u00e9rer vos tableaux Kanban avec Bizneo HR<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Bizneo HR glisse-d\u00e9pose les t\u00e2ches entre les colonnes<\/strong> \u00c0 faire, En cours, Bloqu\u00e9e et Termin\u00e9e, et donne au chef de projet une vue d&#8217;ensemble du pipeline sans relancer personne par message.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Chaque t\u00e2che a son propre responsable, un <strong>temps estim\u00e9, une \u00e9ch\u00e9ance et des rappels<\/strong> automatiques, ce qui \u00e9vite de ressaisir manuellement les m\u00eames informations \u00e0 chaque mise \u00e0 jour.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le logiciel offre aussi une <strong>vue d\u00e9di\u00e9e au chef de projet<\/strong> avec l&#8217;ensemble des projets qu&#8217;il pilote, pour suivre plusieurs tableaux Kanban sans changer d&#8217;outil.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"\/fr\/tableau-de-bord-rh\/\" data-wpel-link=\"internal\" target=\"_blank\"><img decoding=\"async\" width=\"1360\" height=\"408\" src=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH.jpg\" alt=\"Logiciel rapports RH\" class=\"wp-image-45498\" srcset=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH.jpg 1360w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH-300x90.jpg 300w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH-1024x307.jpg 1024w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH-768x230.jpg 768w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH-810x243.jpg 810w, https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2024\/02\/Logiciel-rapports-RH-1140x342.jpg 1140w\" sizes=\"(max-width: 1360px) 100vw, 1360px\" \/><\/a><\/figure>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-d616635a\"><h2 class=\"uagb-heading-text\">Questions fr\u00e9quentes sur le tableau Kanban<\/h2><\/div>\n\n\n<div class=\"wp-block-uagb-faq uagb-faq__outer-wrap uagb-block-204878ed uagb-faq-icon-row uagb-faq-layout-accordion uagb-faq-expand-first-true uagb-faq-inactive-other-true uagb-faq__wrap uagb-buttons-layout-wrap uagb-faq-equal-height     \" data-faqtoggle=\"true\" role=\"tablist\"><script type=\"application\/ld+json\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"FAQPage\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Toutes les \\u00e9quipes ont-elles besoin des m\\u00eames colonnes ?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Non. Les colonnes doivent repr\\u00e9senter les \\u00e9tapes r\\u00e9elles du service. Commencez avec peu d'\\u00e9tapes et n'en s\\u00e9parez une que si cela aide \\u00e0 rep\\u00e9rer un probl\\u00e8me pr\\u00e9cis et \\u00e0 agir dessus.\"}},{\"@type\":\"Question\",\"name\":\"Quelle est la diff\\u00e9rence entre un tableau Kanban et une simple liste de t\\u00e2ches ?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Une liste de t\\u00e2ches n'indique qu'un statut. Un tableau Kanban ajoute une limite de travail en cours et des r\\u00e8gles de passage d'une colonne \\u00e0 l'autre, ce qui rend visibles les blocages avant l'\\u00e9ch\\u00e9ance, pas seulement l'avancement.\"}},{\"@type\":\"Question\",\"name\":\"Quelle est la diff\\u00e9rence entre Kanban et Scrum ?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Le Scrum structure le travail en sprints de deux \\u00e0 quatre semaines, avec des r\\u00f4les d\\u00e9finis (Scrum Master, Product Owner, \\u00e9quipe de d\\u00e9veloppement). Le Kanban n'impose ni d\\u00e9lai ni r\\u00f4le fixe : chaque membre peut prendre une carte, et un m\\u00eame tableau peut courir sur plusieurs mois. Une \\u00e9quipe en Scrum peut malgr\\u00e9 tout adopter des pratiques Kanban pour visualiser son flux.\"}}]}<\/script><div class=\"wp-block-uagb-faq-child uagb-faq-child__outer-wrap uagb-faq-item uagb-block-848ae7a4 \" role=\"tab\" tabindex=\"0\"><div class=\"uagb-faq-questions-button uagb-faq-questions\">\t\t\t<span class=\"uagb-icon uagb-faq-icon-wrap\">\n\t\t\t\t\t\t\t\t<svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox= \"0 0 448 512\"><path d=\"M432 256c0 17.69-14.33 32.01-32 32.01H256v144c0 17.69-14.33 31.99-32 31.99s-32-14.3-32-31.99v-144H48c-17.67 0-32-14.32-32-32.01s14.33-31.99 32-31.99H192v-144c0-17.69 14.33-32.01 32-32.01s32 14.32 32 32.01v144h144C417.7 224 432 238.3 432 256z\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t<span class=\"uagb-icon-active uagb-faq-icon-wrap\">\n\t\t\t\t\t\t\t\t<svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox= \"0 0 448 512\"><path d=\"M400 288h-352c-17.69 0-32-14.32-32-32.01s14.31-31.99 32-31.99h352c17.69 0 32 14.3 32 31.99S417.7 288 400 288z\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/span>\n\t\t\t<h3 class=\"uagb-question\">Toutes les \u00e9quipes ont-elles besoin des m\u00eames colonnes ?<\/h3><\/div><div class=\"uagb-faq-content\"><p>Non. Les colonnes doivent repr\u00e9senter les \u00e9tapes r\u00e9elles du service. Commencez avec peu d&#8217;\u00e9tapes et n&#8217;en s\u00e9parez une que si cela aide \u00e0 rep\u00e9rer un probl\u00e8me pr\u00e9cis et \u00e0 agir dessus.<\/p><\/div><\/div><div class=\"wp-block-uagb-faq-child uagb-faq-child__outer-wrap uagb-faq-item uagb-block-ac56a3a4 \" role=\"tab\" tabindex=\"0\"><div class=\"uagb-faq-questions-button uagb-faq-questions\">\t\t\t<span class=\"uagb-icon uagb-faq-icon-wrap\">\n\t\t\t\t\t\t\t\t<svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox= \"0 0 448 512\"><path d=\"M432 256c0 17.69-14.33 32.01-32 32.01H256v144c0 17.69-14.33 31.99-32 31.99s-32-14.3-32-31.99v-144H48c-17.67 0-32-14.32-32-32.01s14.33-31.99 32-31.99H192v-144c0-17.69 14.33-32.01 32-32.01s32 14.32 32 32.01v144h144C417.7 224 432 238.3 432 256z\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t<span class=\"uagb-icon-active uagb-faq-icon-wrap\">\n\t\t\t\t\t\t\t\t<svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox= \"0 0 448 512\"><path d=\"M400 288h-352c-17.69 0-32-14.32-32-32.01s14.31-31.99 32-31.99h352c17.69 0 32 14.3 32 31.99S417.7 288 400 288z\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/span>\n\t\t\t<h3 class=\"uagb-question\">Quelle est la diff\u00e9rence entre un tableau Kanban et une simple liste de t\u00e2ches ?<\/h3><\/div><div class=\"uagb-faq-content\"><p>Une liste de t\u00e2ches n&#8217;indique qu&#8217;un statut. Un tableau Kanban ajoute une limite de travail en cours et des r\u00e8gles de passage d&#8217;une colonne \u00e0 l&#8217;autre, ce qui rend visibles les blocages avant l&#8217;\u00e9ch\u00e9ance, pas seulement l&#8217;avancement.<\/p><\/div><\/div><div class=\"wp-block-uagb-faq-child uagb-faq-child__outer-wrap uagb-faq-item uagb-block-4e67fe2c \" role=\"tab\" tabindex=\"0\"><div class=\"uagb-faq-questions-button uagb-faq-questions\">\t\t\t<span class=\"uagb-icon uagb-faq-icon-wrap\">\n\t\t\t\t\t\t\t\t<svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox= \"0 0 448 512\"><path d=\"M432 256c0 17.69-14.33 32.01-32 32.01H256v144c0 17.69-14.33 31.99-32 31.99s-32-14.3-32-31.99v-144H48c-17.67 0-32-14.32-32-32.01s14.33-31.99 32-31.99H192v-144c0-17.69 14.33-32.01 32-32.01s32 14.32 32 32.01v144h144C417.7 224 432 238.3 432 256z\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t<span class=\"uagb-icon-active uagb-faq-icon-wrap\">\n\t\t\t\t\t\t\t\t<svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox= \"0 0 448 512\"><path d=\"M400 288h-352c-17.69 0-32-14.32-32-32.01s14.31-31.99 32-31.99h352c17.69 0 32 14.3 32 31.99S417.7 288 400 288z\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/span>\n\t\t\t<h3 class=\"uagb-question\">Quelle est la diff\u00e9rence entre Kanban et Scrum ?<\/h3><\/div><div class=\"uagb-faq-content\"><p>Le Scrum structure le travail en sprints de deux \u00e0 quatre semaines, avec des r\u00f4les d\u00e9finis (Scrum Master, Product Owner, \u00e9quipe de d\u00e9veloppement). Le Kanban n&#8217;impose ni d\u00e9lai ni r\u00f4le fixe : chaque membre peut prendre une carte, et un m\u00eame tableau peut courir sur plusieurs mois. Une \u00e9quipe en Scrum peut malgr\u00e9 tout adopter des pratiques Kanban pour visualiser son flux.<\/p><\/div><\/div><\/div>\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Un tableau Kanban est un outil visuel qui organise les t\u00e2ches d\u2019une \u00e9quipe par colonnes (\u00e0 faire, en cours, termin\u00e9) pour limiter le travail en cours et fluidifier le flux de travail.<\/p>\n","protected":false},"author":50,"featured_media":66129,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[736],"tags":[],"class_list":["post-66190","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gestion-de-projets-et-taches"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tableau Kanban : d\u00e9finition et comment le cr\u00e9er<\/title>\n<meta name=\"description\" content=\"Qu\u2019est-ce qu\u2019un tableau Kanban, comment il fonctionne et comment en cr\u00e9er un en 6 \u00e9tapes, avec exemple concret et indicateurs \u00e0 suivre.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tableau Kanban : d\u00e9finition et comment le cr\u00e9er\" \/>\n<meta property=\"og:description\" content=\"Qu\u2019est-ce qu\u2019un tableau Kanban, comment il fonctionne et comment en cr\u00e9er un en 6 \u00e9tapes, avec exemple concret et indicateurs \u00e0 suivre.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/\" \/>\n<meta property=\"og:site_name\" content=\"Blog de Recursos Humanos de Bizneo HR: pr\u00e1ctico y actual\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T09:42:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T09:42:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Kanban.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Antoine Destrument\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Antoine Destrument\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/\"},\"author\":{\"name\":\"Antoine Destrument\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#\\\/schema\\\/person\\\/b64c2837f8e507ff08bb119a23fcb096\"},\"headline\":\"Tableau Kanban : d\u00e9finition et comment en cr\u00e9er un en 6 \u00e9tapes\",\"datePublished\":\"2026-10-21T09:42:09+00:00\",\"dateModified\":\"2026-10-21T09:42:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/\"},\"wordCount\":2017,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Kanban.png\",\"articleSection\":[\"Gestion de projets et taches\"],\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/\",\"url\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/\",\"name\":\"Tableau Kanban : d\u00e9finition et comment le cr\u00e9er\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Kanban.png\",\"datePublished\":\"2026-10-21T09:42:09+00:00\",\"dateModified\":\"2026-10-21T09:42:10+00:00\",\"description\":\"Qu\u2019est-ce qu\u2019un tableau Kanban, comment il fonctionne et comment en cr\u00e9er un en 6 \u00e9tapes, avec exemple concret et indicateurs \u00e0 suivre.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Kanban.png\",\"contentUrl\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Kanban.png\",\"width\":1672,\"height\":941,\"caption\":\"Kanban\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/tableau-kanban\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gestion de projets et taches\",\"item\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/fr\\\/category\\\/gestion-de-projets-et-taches\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tableau Kanban : d\u00e9finition et comment en cr\u00e9er un en 6 \u00e9tapes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/\",\"name\":\"Blog de Recursos Humanos de Bizneo HR: pr\u00e1ctico y actual\",\"description\":\"Todo sobre actualidad, herramientas y tecnolog\u00eda  para optimizar la gesti\u00f3n del talento humano\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#organization\",\"name\":\"Bizneo HR\",\"url\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/Icono-Logo-Bizneo-HR.png\",\"contentUrl\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/Icono-Logo-Bizneo-HR.png\",\"width\":834,\"height\":834,\"caption\":\"Bizneo HR\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/#\\\/schema\\\/person\\\/b64c2837f8e507ff08bb119a23fcb096\",\"name\":\"Antoine Destrument\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/68521b539bef2722fa179bd83cfff8160f11d397804d65ba4a229efd21bac2e3?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/68521b539bef2722fa179bd83cfff8160f11d397804d65ba4a229efd21bac2e3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/68521b539bef2722fa179bd83cfff8160f11d397804d65ba4a229efd21bac2e3?s=96&d=mm&r=g\",\"caption\":\"Antoine Destrument\"},\"url\":\"https:\\\/\\\/www.bizneo.com\\\/blog\\\/author\\\/antoine\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tableau Kanban : d\u00e9finition et comment le cr\u00e9er","description":"Qu\u2019est-ce qu\u2019un tableau Kanban, comment il fonctionne et comment en cr\u00e9er un en 6 \u00e9tapes, avec exemple concret et indicateurs \u00e0 suivre.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"es_ES","og_type":"article","og_title":"Tableau Kanban : d\u00e9finition et comment le cr\u00e9er","og_description":"Qu\u2019est-ce qu\u2019un tableau Kanban, comment il fonctionne et comment en cr\u00e9er un en 6 \u00e9tapes, avec exemple concret et indicateurs \u00e0 suivre.","og_url":"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/","og_site_name":"Blog de Recursos Humanos de Bizneo HR: pr\u00e1ctico y actual","article_published_time":"2026-10-21T09:42:09+00:00","article_modified_time":"2026-10-21T09:42:10+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Kanban.png","type":"image\/png"}],"author":"Antoine Destrument","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Antoine Destrument","Tiempo de lectura":"10 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/#article","isPartOf":{"@id":"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/"},"author":{"name":"Antoine Destrument","@id":"https:\/\/www.bizneo.com\/blog\/#\/schema\/person\/b64c2837f8e507ff08bb119a23fcb096"},"headline":"Tableau Kanban : d\u00e9finition et comment en cr\u00e9er un en 6 \u00e9tapes","datePublished":"2026-10-21T09:42:09+00:00","dateModified":"2026-10-21T09:42:10+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/"},"wordCount":2017,"commentCount":0,"publisher":{"@id":"https:\/\/www.bizneo.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Kanban.png","articleSection":["Gestion de projets et taches"],"inLanguage":"es","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/","url":"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/","name":"Tableau Kanban : d\u00e9finition et comment le cr\u00e9er","isPartOf":{"@id":"https:\/\/www.bizneo.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/#primaryimage"},"image":{"@id":"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Kanban.png","datePublished":"2026-10-21T09:42:09+00:00","dateModified":"2026-10-21T09:42:10+00:00","description":"Qu\u2019est-ce qu\u2019un tableau Kanban, comment il fonctionne et comment en cr\u00e9er un en 6 \u00e9tapes, avec exemple concret et indicateurs \u00e0 suivre.","breadcrumb":{"@id":"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/#primaryimage","url":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Kanban.png","contentUrl":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Kanban.png","width":1672,"height":941,"caption":"Kanban"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bizneo.com\/blog\/fr\/tableau-kanban\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bizneo.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Gestion de projets et taches","item":"https:\/\/www.bizneo.com\/blog\/fr\/category\/gestion-de-projets-et-taches\/"},{"@type":"ListItem","position":3,"name":"Tableau Kanban : d\u00e9finition et comment en cr\u00e9er un en 6 \u00e9tapes"}]},{"@type":"WebSite","@id":"https:\/\/www.bizneo.com\/blog\/#website","url":"https:\/\/www.bizneo.com\/blog\/","name":"Blog de Recursos Humanos de Bizneo HR: pr\u00e1ctico y actual","description":"Todo sobre actualidad, herramientas y tecnolog\u00eda  para optimizar la gesti\u00f3n del talento humano","publisher":{"@id":"https:\/\/www.bizneo.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.bizneo.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.bizneo.com\/blog\/#organization","name":"Bizneo HR","url":"https:\/\/www.bizneo.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.bizneo.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2020\/09\/Icono-Logo-Bizneo-HR.png","contentUrl":"https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2020\/09\/Icono-Logo-Bizneo-HR.png","width":834,"height":834,"caption":"Bizneo HR"},"image":{"@id":"https:\/\/www.bizneo.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.bizneo.com\/blog\/#\/schema\/person\/b64c2837f8e507ff08bb119a23fcb096","name":"Antoine Destrument","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/68521b539bef2722fa179bd83cfff8160f11d397804d65ba4a229efd21bac2e3?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/68521b539bef2722fa179bd83cfff8160f11d397804d65ba4a229efd21bac2e3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/68521b539bef2722fa179bd83cfff8160f11d397804d65ba4a229efd21bac2e3?s=96&d=mm&r=g","caption":"Antoine Destrument"},"url":"https:\/\/www.bizneo.com\/blog\/author\/antoine\/"}]}},"spectra_custom_meta":{"_uagb_previous_block_counts":["a:90:{s:21:\"uagb\/advanced-heading\";i:1;s:15:\"uagb\/blockquote\";i:0;s:12:\"uagb\/buttons\";i:0;s:18:\"uagb\/buttons-child\";i:0;s:19:\"uagb\/call-to-action\";i:0;s:15:\"uagb\/cf7-styler\";i:0;s:11:\"uagb\/column\";i:0;s:12:\"uagb\/columns\";i:0;s:14:\"uagb\/container\";i:0;s:21:\"uagb\/content-timeline\";i:0;s:27:\"uagb\/content-timeline-child\";i:0;s:14:\"uagb\/countdown\";i:0;s:12:\"uagb\/counter\";i:0;s:8:\"uagb\/faq\";i:1;s:14:\"uagb\/faq-child\";i:3;s:10:\"uagb\/forms\";i:0;s:17:\"uagb\/forms-accept\";i:0;s:19:\"uagb\/forms-checkbox\";i:0;s:15:\"uagb\/forms-date\";i:0;s:16:\"uagb\/forms-email\";i:0;s:17:\"uagb\/forms-hidden\";i:0;s:15:\"uagb\/forms-name\";i:0;s:16:\"uagb\/forms-phone\";i:0;s:16:\"uagb\/forms-radio\";i:0;s:17:\"uagb\/forms-select\";i:0;s:19:\"uagb\/forms-textarea\";i:0;s:17:\"uagb\/forms-toggle\";i:0;s:14:\"uagb\/forms-url\";i:0;s:14:\"uagb\/gf-styler\";i:0;s:15:\"uagb\/google-map\";i:0;s:11:\"uagb\/how-to\";i:0;s:16:\"uagb\/how-to-step\";i:0;s:9:\"uagb\/icon\";i:0;s:14:\"uagb\/icon-list\";i:0;s:20:\"uagb\/icon-list-child\";i:0;s:10:\"uagb\/image\";i:0;s:18:\"uagb\/image-gallery\";i:0;s:13:\"uagb\/info-box\";i:0;s:18:\"uagb\/inline-notice\";i:0;s:11:\"uagb\/lottie\";i:0;s:21:\"uagb\/marketing-button\";i:0;s:10:\"uagb\/modal\";i:0;s:18:\"uagb\/popup-builder\";i:0;s:16:\"uagb\/post-button\";i:0;s:18:\"uagb\/post-carousel\";i:0;s:17:\"uagb\/post-excerpt\";i:0;s:14:\"uagb\/post-grid\";i:0;s:15:\"uagb\/post-image\";i:0;s:17:\"uagb\/post-masonry\";i:0;s:14:\"uagb\/post-meta\";i:0;s:18:\"uagb\/post-taxonomy\";i:0;s:18:\"uagb\/post-timeline\";i:0;s:15:\"uagb\/post-title\";i:0;s:20:\"uagb\/restaurant-menu\";i:0;s:26:\"uagb\/restaurant-menu-child\";i:0;s:11:\"uagb\/review\";i:0;s:12:\"uagb\/section\";i:0;s:14:\"uagb\/separator\";i:0;s:11:\"uagb\/slider\";i:0;s:17:\"uagb\/slider-child\";i:0;s:17:\"uagb\/social-share\";i:0;s:23:\"uagb\/social-share-child\";i:0;s:16:\"uagb\/star-rating\";i:0;s:23:\"uagb\/sure-cart-checkout\";i:0;s:22:\"uagb\/sure-cart-product\";i:0;s:15:\"uagb\/sure-forms\";i:0;s:22:\"uagb\/table-of-contents\";i:0;s:9:\"uagb\/tabs\";i:0;s:15:\"uagb\/tabs-child\";i:0;s:18:\"uagb\/taxonomy-list\";i:0;s:9:\"uagb\/team\";i:0;s:16:\"uagb\/testimonial\";i:0;s:14:\"uagb\/wp-search\";i:0;s:19:\"uagb\/instagram-feed\";i:0;s:10:\"uagb\/login\";i:0;s:17:\"uagb\/loop-builder\";i:0;s:18:\"uagb\/loop-category\";i:0;s:20:\"uagb\/loop-pagination\";i:0;s:15:\"uagb\/loop-reset\";i:0;s:16:\"uagb\/loop-search\";i:0;s:14:\"uagb\/loop-sort\";i:0;s:17:\"uagb\/loop-wrapper\";i:0;s:13:\"uagb\/register\";i:0;s:19:\"uagb\/register-email\";i:0;s:24:\"uagb\/register-first-name\";i:0;s:23:\"uagb\/register-last-name\";i:0;s:22:\"uagb\/register-password\";i:0;s:30:\"uagb\/register-reenter-password\";i:0;s:19:\"uagb\/register-terms\";i:0;s:22:\"uagb\/register-username\";i:0;}"],"_thumbnail_id":["66129"],"_yoast_wpseo_title":["Tableau Kanban : d\u00e9finition et comment le cr\u00e9er"],"_yoast_wpseo_metadesc":["Qu\u2019est-ce qu\u2019un tableau Kanban, comment il fonctionne et comment en cr\u00e9er un en 6 \u00e9tapes, avec exemple concret et indicateurs \u00e0 suivre."],"_yoast_wpseo_focuskw":["kanban"],"_yoast_wpseo_primary_category":["736"],"_edit_lock":["1792589890:50"],"_edit_last":["50"],"_yoast_wpseo_linkdex":["93"],"_yoast_wpseo_content_score":["90"],"_yoast_wpseo_seo_title_score":["83"],"_yoast_wpseo_meta_description_score":["100"],"_yoast_wpseo_estimated-reading-time-minutes":["10"],"_uag_css_file_name":["uag-css-66190.css"],"_uag_page_assets":["a:9:{s:3:\"css\";s:6752:\".wp-block-uagb-advanced-heading h1,.wp-block-uagb-advanced-heading h2,.wp-block-uagb-advanced-heading h3,.wp-block-uagb-advanced-heading h4,.wp-block-uagb-advanced-heading h5,.wp-block-uagb-advanced-heading h6,.wp-block-uagb-advanced-heading p,.wp-block-uagb-advanced-heading div{word-break:break-word}.wp-block-uagb-advanced-heading .uagb-heading-text{margin:0}.wp-block-uagb-advanced-heading .uagb-desc-text{margin:0}.wp-block-uagb-advanced-heading .uagb-separator{font-size:0;border-top-style:solid;display:inline-block;margin:0 0 10px 0}.wp-block-uagb-advanced-heading .uagb-highlight{color:#f78a0c;border:0;transition:all .3s ease}.uag-highlight-toolbar{border-left:0;border-top:0;border-bottom:0;border-radius:0;border-right-color:#1e1e1e}.uag-highlight-toolbar .components-button{border-radius:0;outline:none}.uag-highlight-toolbar .components-button.is-primary{color:#fff}.wp-block-uagb-faq{width:100%}.wp-block-uagb-faq.uagb-faq-layout-accordion .uagb-faq-child__outer-wrap .uagb-faq-questions-button{cursor:pointer}.wp-block-uagb-faq .uagb-faq-content{margin-bottom:0}.wp-block-uagb-faq .uagb-faq-content p{margin:auto}.uagb-faq-layout-grid.uagb-faq-equal-height.uagb-faq__wrap .uagb-faq-child__outer-wrap,.uagb-faq-layout-grid.uagb-faq-equal-height.uagb-faq__wrap .uagb-faq-item{height:100%}body[class*=astra] .uagb-faq-questions{line-height:normal}.uagb-faq-item{overflow:hidden}.wp-block-uagb-faq-child .uagb-faq-questions-button{display:flex;align-items:center}.wp-block-uagb-faq-child .uagb-faq-questions-button .uagb-faq-icon-wrap{display:flex;align-items:center}.wp-block-uagb-faq-child .uagb-faq-questions-button .uagb-question{width:100%;margin-top:0;margin-bottom:0}.wp-block-uagb-faq-child .uagb-icon svg,.wp-block-uagb-faq-child .uagb-icon-active svg{width:15px;height:15px;font-size:15px}.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap.uagb-faq-item .uagb-icon-active,.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap.uagb-faq-item.uagb-faq-item-active .uagb-icon,.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap .uagb-faq-item .uagb-icon-active,.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap .uagb-faq-item.uagb-faq-item-active .uagb-icon{display:none;width:0;height:0;margin:0}.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap.uagb-faq-item .uagb-icon,.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap.uagb-faq-item.uagb-faq-item-active .uagb-icon-active,.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap .uagb-faq-item .uagb-icon,.wp-block-uagb-faq-child.uagb-faq-child__outer-wrap .uagb-faq-item.uagb-faq-item-active .uagb-icon-active{display:flex;width:auto;height:auto}.uagb-faq-layout-grid .uagb-faq-child__outer-wrap.uagb-faq-item .uagb-icon,.uagb-faq-layout-grid .uagb-faq-child__outer-wrap.uagb-faq-item.uagb-faq-item-active .uagb-icon-active,.uagb-faq-layout-grid .uagb-faq-child__outer-wrap .uagb-faq-item .uagb-icon,.uagb-faq-layout-grid .uagb-faq-child__outer-wrap .uagb-faq-item.uagb-faq-item-active .uagb-icon-active{display:none}.uagb-faq-layout-grid .uagb-faq-child__outer-wrap.uagb-faq-item span.uagb-icon-active.uagb-faq-icon-wrap,.uagb-faq-layout-grid .uagb-faq-child__outer-wrap.uagb-faq-item.uagb-faq-item-active .uagb-icon-active,.uagb-faq-layout-grid .uagb-faq-child__outer-wrap .uagb-faq-item span.uagb-icon-active.uagb-faq-icon-wrap,.uagb-faq-layout-grid .uagb-faq-child__outer-wrap .uagb-faq-item.uagb-faq-item-active .uagb-icon-active{display:none}.wp-block-uagb-advanced-heading.uagb-block-d616635a.wp-block-uagb-advanced-heading .uagb-desc-text{margin-bottom: 15px;}.wp-block-uagb-advanced-heading.uagb-block-d616635a.wp-block-uagb-advanced-heading .uagb-highlight{font-style: normal;font-weight: Default;background: #007cba;color: #fff;-webkit-text-fill-color: #fff;}.wp-block-uagb-advanced-heading.uagb-block-d616635a.wp-block-uagb-advanced-heading .uagb-highlight::-moz-selection{color: #fff;background: #007cba;-webkit-text-fill-color: #fff;}.wp-block-uagb-advanced-heading.uagb-block-d616635a.wp-block-uagb-advanced-heading .uagb-highlight::selection{color: #fff;background: #007cba;-webkit-text-fill-color: #fff;}.uagb-block-204878ed .uagb-icon svg{width: 12px;height: 12px;font-size: 12px;}.uagb-block-204878ed .uagb-icon-active svg{width: 12px;height: 12px;font-size: 12px;}.uagb-block-204878ed .uagb-faq-child__outer-wrap{margin-bottom: 10px;}.uagb-block-204878ed .uagb-faq-item{border-top-width: 1px;border-left-width: 1px;border-right-width: 1px;border-bottom-width: 1px;border-top-left-radius: 2px;border-top-right-radius: 2px;border-bottom-left-radius: 2px;border-bottom-right-radius: 2px;border-color: #D2D2D2;border-style: solid;}.uagb-block-204878ed .uagb-faq-questions-button{padding-top: 10px;padding-bottom: 10px;padding-right: 10px;padding-left: 10px;}.uagb-block-204878ed .uagb-faq-content{padding-top: 10px;padding-bottom: 10px;padding-right: 10px;padding-left: 10px;}.uagb-block-204878ed .uagb-faq-content span{margin-top: 10px;margin-bottom: 10px;margin-right: 10px;margin-left: 10px;}.uagb-block-204878ed.uagb-faq-icon-row .uagb-faq-item .uagb-faq-icon-wrap{margin-right: 10px;}.uagb-block-204878ed.uagb-faq-icon-row-reverse .uagb-faq-item .uagb-faq-icon-wrap{margin-left: 10px;}.uagb-block-204878ed .uagb-faq-item .uagb-faq-questions-button.uagb-faq-questions{flex-direction: row;}.uagb-block-204878ed .wp-block-uagb-faq-child.uagb-faq-child__outer-wrap .uagb-faq-content {display: none;}@media only screen and (max-width: 976px) {.uagb-block-204878ed.uagb-faq-icon-row .uagb-faq-item .uagb-faq-icon-wrap{margin-right: 10px;}.uagb-block-204878ed.uagb-faq-icon-row-reverse .uagb-faq-item .uagb-faq-icon-wrap{margin-left: 10px;}.uagb-block-204878ed .uagb-faq-questions-button{padding-top: 10px;padding-bottom: 10px;padding-right: 10px;padding-left: 10px;}.uagb-block-204878ed .uagb-faq-content{padding-top: 10px;padding-bottom: 10px;padding-right: 10px;padding-left: 10px;}.uagb-block-204878ed .uagb-faq-content span{margin-top: 10px;margin-bottom: 10px;margin-right: 10px;margin-left: 10px;}.uagb-block-204878ed .uagb-faq-item{border-style: solid;border-color: #D2D2D2;}}@media only screen and (max-width: 767px) {.uagb-block-204878ed.uagb-faq-icon-row .uagb-faq-item .uagb-faq-icon-wrap{margin-right: 10px;}.uagb-block-204878ed .uagb-faq-item{border-style: solid;border-color: #D2D2D2;}.uagb-block-204878ed.uagb-faq-icon-row-reverse .uagb-faq-item .uagb-faq-icon-wrap{margin-left: 10px;}.uagb-block-204878ed .uagb-faq-questions-button{padding-top: 10px;padding-bottom: 10px;padding-right: 10px;padding-left: 10px;}.uagb-block-204878ed .uagb-faq-content{padding-top: 10px;padding-bottom: 10px;padding-right: 10px;padding-left: 10px;}.uagb-block-204878ed .uagb-faq-content span{margin-top: 10px;margin-bottom: 10px;margin-right: 10px;margin-left: 10px;}}\";s:2:\"js\";s:0:\"\";s:18:\"current_block_list\";a:11:{i:0;s:14:\"core\/paragraph\";i:1;s:12:\"core\/heading\";i:2;s:10:\"core\/image\";i:3;s:9:\"core\/list\";i:4;s:14:\"core\/list-item\";i:5;s:10:\"core\/table\";i:6;s:21:\"uagb\/advanced-heading\";i:7;s:8:\"uagb\/faq\";i:8;s:14:\"uagb\/faq-child\";i:9;s:12:\"core\/details\";i:10;s:14:\"core\/shortcode\";}s:8:\"uag_flag\";b:1;s:11:\"uag_version\";s:10:\"1793019994\";s:6:\"gfonts\";a:0:{}s:10:\"gfonts_url\";s:0:\"\";s:12:\"gfonts_files\";a:0:{}s:14:\"uag_faq_layout\";b:1;}"]},"uagb_featured_image_src":{"full":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Kanban.png",1672,941,false],"thumbnail":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Kanban-150x150.png",150,150,true],"medium":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Kanban-300x169.png",300,169,true],"medium_large":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Kanban-768x432.png",768,432,true],"large":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Kanban-1024x576.png",1024,576,true],"1536x1536":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Kanban-1536x864.png",1536,864,true],"2048x2048":["https:\/\/www.bizneo.com\/blog\/wp-content\/uploads\/2026\/10\/Kanban.png",1672,941,false]},"uagb_author_info":{"display_name":"Antoine Destrument","author_link":"https:\/\/www.bizneo.com\/blog\/author\/antoine\/"},"uagb_comment_info":0,"uagb_excerpt":"Un tableau Kanban est un outil visuel qui organise les t\u00e2ches d\u2019une \u00e9quipe par colonnes (\u00e0 faire, en cours, termin\u00e9) pour limiter le travail en cours et fluidifier le flux de travail.","_links":{"self":[{"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/posts\/66190","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/users\/50"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/comments?post=66190"}],"version-history":[{"count":10,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/posts\/66190\/revisions"}],"predecessor-version":[{"id":66217,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/posts\/66190\/revisions\/66217"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/media\/66129"}],"wp:attachment":[{"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/media?parent=66190"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/categories?post=66190"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bizneo.com\/blog\/wp-json\/wp\/v2\/tags?post=66190"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}